PROCEEDINGS OF 123rd MEETING OF THE ERC-NCTE HELD ON 17th - 20th August 2011

The 123rd Meeting of the Eastern Regional Committee (ERC), National Council for Teacher Education (NCTE) was convened on 17th-20th August 2011 at Conference Hall, ERC, NCTE, 15, Nilakantha Nagar, Nayapalli, Bhubaneswar.

In pursuance of the Gazette Notification No. 121 dated June 2, 2011 in exercise of powers conferred under Section 21(2)(b) of the NCTE Act, 1993 read with Clause 4 of Regulations No.F.28-14/95, dated 22nd January, 1996, Prof.(Dr.) P. C. Mahapatra has been nominated as Chairperson of the Eastern Regional Committee, Bhubaneswar. The Chairperson and Convener were present.

1.   Prof.(Dr.) P. C. Mahapatra, Chairperson, ERC, NCTE

2.   Dr. Ram Kishor, Convener, ERC, NCTE.

           The Regional Director apprised the Chairperson, ERC about the provisions of the NCTE Act, Rules & Regulations and instructions issued from time to time. With the permission of Prof. (Dr.) P. C. Mahapatra, Chairperson, Dr. Ram Kishor (Convener) presented the Agenda for perusal and suitable decision as per provisions of the NCTE Act, Rules & Regulations before the Committee

The Eastern Regional Committee after going through the original file of institutions, reply received from the NCTE Hqrs. viz-a-viz provisions of the NCTE Act, Rules & Regulations considered all the agenda items placed before the ERC in its 123rd meeting. Item-wise decisions taken are as follows:

 

Sl.No.

Item No.

Contents

Decision of the ERC

I

ER.123.1

Confirmation of the Proceedings of 122nd ERC meeting, 28th-30th July 2011 at Bhubaneswar.

The ERC noted that the NCTE-HQrs vide letter No. 40-1/2011/NCTE/CDN dated 11th August 2011 it was informed that the ERC may go ahead with the decisions contained in the 122nd meeting while ensuring that the decision correctly reflect the facts on record and all the decisions are in accordance with the provisions of the NCTE, Act, Rules and Regulations as mended from time to time and the instructions issued by the NCTE (Hqrs) from time to time.

The Committee noted and endorsed the decision of Convener in initiating the process of implementing the decision of 122nd meeting of ERC as per the spirit of the decision taken by the ERC.


 

    ER.123.2 Deferred Items (Annexure-I) Agenda Item No.123.2.8 : Reply to Show Cause Notice Reply U/S 7(I).

 

Sl. No.

Item No.

Ref. Item No.

Name of the Institution with Code/ Contents

Decision of the ERC

1

ER-123.2.8.1

ER-122.8.13

D S College, Plot No. 548 “KA”, PO / City Katihar, Tehsil / Taluka, Katihar, Distt. Katihar, Bihar – 854 105 (B.Ed) (Code No. ERCAPP637)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee noted the following:-

  1. The Hard copy of the application submitted by the institution was not received within the stipulated date.

  2. Certified copy of land documents in the name of institution certified by the competent authority not submitted.

In view of the above the reply of the institution was not found to be satisfactory, therefore, the ERC decides that the application of the institution be summarily rejected under clause 7(1) of the NCTE Regulations, 2009.


2

ER-123.2.8.2

ER-122.8.14

Parwati Science College, Vill/Po- Madhepura, Tehsil/Taluka- Madhepura, Dist.- Madhepura, Bihar- 852113 (Code No. ERCAPP575)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee noted the following:-

  1. The Hard copy of the application submitted by the institution was not received within the stipulated date.

  2. Certified copy of land documents in the name of institution certified by the competent authority not submitted.

In view of the above the reply of the institution was not found to be satisfactory, therefore, the ERC decides that the application of the institution be summarily rejected under clause 7(1) of the NCTE Regulations, 2009.


3

ER-123.2.8.3

ER-122.8.15

Mahant Darshan Das Mahila College, Plot No. 734, Club Road, Vill- Muzaffarpur, Po- Ramna, Tehsil/Taluka- Mushahari, Dist.- Muzaffarpur, Bihar- 842002 (Code No. ERCAPP455)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee noted that the land documents submitted are in the name of institution, hence, the application of the institution be processed further as per NCTE Rules and Regulations.


4

ER-123.2.8.4

ER-122.8.16

Shanti Prasad Jain College, Vill- Mirzapur, Po- Sasaram, City- Sasaram, Dist.- Rohtas, Bihar- 821115 (Code No. ERCAPP418)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Processing Fee as provided under Rule 9 of the NCTE Rules, 1997 as amended from time to time not submitted by the institution. The institution is required to submit a certificate from the State Govt of Bihar that the B.Ed course is not being self-financed.

  2. Fixed Deposit Receipt of Rs. 5.00 lacs and 3.00 lacs of Nationalised Bank towards Endowment and Reserve fund respectively not submitted. The institution is required to submit a certificate from the State Govt of Bihar that the B.Ed course is not being self-financed.

  3. Building plan prepared by the approved Civil Engineer / Architect and certified by the competent Govt authority not submitted by the institution.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.

The Committee also decides that a copy of the notice be also sent to the Secretary, Higher Education, Deptt, Govt of Bihar and Registrar, VKS University, Ara, Bihar.


5

ER-123.2.8.5

ER-122.8.17

DIET, Dhenkanal, Orissa- 759001 (Code No. ERCAPP657)

The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Building plan does not contain the land area, total built up area, Plot No, Khata No and name of the institution as per NCTE norms. Building plan is to be prepared by the approved Civil Engineer / Architect and certified by the competent Govt Authority.

  2. The land documents signed by the principal to be countersigned by the competent Govt authority with due office seal.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.

The Committee also decides that a copy of the notice be also sent to the Secretary, School and Mass Education, Govt of Orissa, Bhubaneshwar, Orissa for kind information & suitable necessary action.


6

ER-123.2.8.6

ER-122.8.18

District Institute of Education & Training (DIET), Plot No. 717/3157, Vill/Po/City- Jagatsignhpur, Tehsil/Taluka- Jagatsignhpur, Dist.- Jagatsignhpur, Orissa-754103

(Code No. ERCAPP653)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.


The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Building plan does not contain the land area, total built up area, Plot No, Khata No and name of the institution as per NCTE norms. Building plan is to be prepared by the approved Civil Engineer / Architect and certified by the competent Govt Authority.

  2. The land documents submitted by the institution has to be certified by the principal with seal.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.

The Committee also decides that a copy of the notice be also sent to the Secretary, School and Mass Education, Govt of Orissa, Bhubaneshwar, Orissa for kind information & suitable necessary action.


7

ER-123.2.8.7

ER-122.8.19

Hooghly B C Roy Institute, Plot no-3595, Vill-Boinchi Gram, Po-Boinchi Gram, Tehsil/Taluka-Boinchi, Town/City-Hooghly, State-West Bengal, Dist-Hooghly(WB),Pin-712101 (D.El.Ed) (Private) (West Bengal Board of Primary Education) (Code No.ERCAPP699)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee noted and decided the following:-

The institution has not submitted the following documents :-

  1. The original FDRs of Rs. 5.00 lacs and 3.00 lacs of Nationalised Bank towards Endowment and Reserve Fund respectively.

  2. Approved Building plan by the competent Govt Authority.

  3. Notarised copy of Change of Land Use issued by the competent Govt Authority.

The ERC observed that the same institution i.e. Hooghly B.C. Roy Institute has applied for B.Ed course. As per Regulations 2009 under clause 8 (2), In the first instance, an institution shall be considered for grant of recognition for only one course for the basic as prescribed in the norms and standards for the particular teacher education programme. As the case of applicant for opening B.Ed coruse of the institution has already been processed, hence, the ERC decided that the application of this institution for opening D.El.Ed course be refused.


8

ER-123.2.8.8

ER-122.8.20

Pratap Chandra College of Education, Plot.no-374,378/234, Vill-Gargaria,Po-Kortia,Tehsil/Taluka-Satma, Town/City-Jhargram, Dist-Paschim Medinipur, State-West Bengal, Pin-721506 (B.Ed) (Vidyasagar University) (Code No. ERCAPP769)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.


The Committee noted that a show cause noticed was issued to the institution under clause 7(1) of NCTE Regulations, 2009, the Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Building plan not prepared as per the requirement of B.Ed training college such as Multipurpose hall, Library, Laboratories, different resource centers etc as per NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


       

ER.123.2.8(i) Reply to Deficiency Letter issued to the institution:

Sl.No.

Item No.

Ref. Item No.

Name of the Institution with Code/ Contents

Decision of the ERC

9

ER-123.2.8(i).1

ER-122.8(i).55

Edugate Teachers Training Institute, Plot No. 1/33, 1/34, 1/35, Vill. – Maliyara, Po. – Midnapore, Tehsil/Taluka – Maliyara, Town/City – Midnapore, Dist. – Midnapore, West Bengal – 721101 (D.El. Ed.) (Privave) (West Bengal Board of Primary Education) (Code No. ERCAPP689)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following clarification :-

  1. The object for which the society is established do not indicate the establishment of teacher training institute or for any educational purpose relating to teaching of teachers.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


10

ER-123.2.8(i).2

ER-122.8(i).56

Indira Gandhi Teachers Training College, Plot No.997, Street. No.997, Vill-Panduah, Po-Panduah, Tehsil/Taluka-Namaz Gram, Town/City-Panduah, Dist-Hooghly, State-West Bengal -712149 (D.El. Ed.) (Privave) (West Bengal Board of Primary Education) (Code No. ERCAPP602)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. State Govt. Recommendation not received

  2. Building plan prepared by the approved Civil Engineer / Architect and certified by the competent Govt. Authority not submitted as per NCTE norms.

  3. Site plan is not clear as it does not show the contiguous of the plots.

  4. Notarised copy of Change of Land Use Certificate issued by the competent Govt Authority not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


11

ER-123.2.8(i).3

ER-122.8(i).57

Deben Mahto Teacher Training Institute, Deben Mahato Smriti Raksha Committee, Plot.No-3246, Street/ Road – Lalpur Road Vill/Town/City-Amlatora, Po-Chatumadar, Tehsil/ Taluka-Purulia, Town/City-Purulia, Dist-Purulia, State-West Bengal-723130 (D.El. Ed.) (Privave) (West Bengal Board of Primary Education) (Code No. ERCAPP643)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The English version of Sale Deed No. 5378 dated 30.10.2009 not notarized.

  2. Original FDR for Rs. 5.00 lacs and 3.00 lacs of Nationalised Bank towards Endowment and Reserve Fund respectively not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


12

ER-123.2.8(i).4

ER-122.8(i).58

Rajib Gandhi Memorial Primary Teachers Training Institute, Plot No. – 402, 403, Vill. – Bhawanipur, Po. – Chitrasenpur, Tehsil/Taluka – Uluberia, Town/City – Udaynarayanpur, Dist. – Howrah, West Bengal – 711412 (D.El. Ed.) (Privave) (West Bengal Board of Primary Education) (Code No. ERCAPP779)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution as per provisions of the NCTE Regulations, 2009, the Committee considered the reply of the institution found the same to be satisfactory, therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filled up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


13

ER-123.2.8(i).5

ER-122.8(i).59

Bardhaman Sikshak samsad Institute, Plot No. 4292, Vill. – Nari, Po. – Burdwan, Tehsil/Taluka/Town/City – Burdwan, Dist. – Bardhaman, West Bengal – 713101 (D.El. Ed.) (Privave) (West Bengal Board of Primary Education)

(Code No. ERCAPP559)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Notarised copy of Land Use Certificate is submitted unsigned without any office seal.

  2. Mutation Certificate is unsigned and without office seal.

  3. Land Possession Certificate not signed by the competent Govt Authority

  4. Building Completion Certificate in the prescribed format (copy enclosed)

  5. Conversion of land character from one to another not signed and stamped by the competent Govt Authority.

  6. A Resolution of the trust No. 127 dated 05.06.2010 is also unsigned.

  7. Building plan does not indicate different rooms like library, Multipurpose Hall, laboratories etc as per the NCTE norms.

  8. Building plan submitted by the institution is not signed by the competent Govt Authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


14

ER-123.2.8(i).6

ER-122.8(i).60

Bhatjangla Shipra D.Ed. College, Plot No. – LR 80, 81, Vill. – Durgapur, PO. – Kalirhat, Tehsil/Taluka – Krishnagar, Town/City – Krishnagar, Dist. – Nadia, West Bengal – 741184 (D.El. Ed.) (Privave) (West Bengal Board of Primary Education)

(Code No. ERCAPP500)


The decision on the item has already been taken by ERC in its 122nd meeting vide Agenda Item No. ER-122.8(i).12.

15

ER-123.2.8(i).7

ER-122.8(i).61

SUM College of Education, Plot No. – 627, vill. – Panchpota, Po. – Babia Gobindapur, Tehsil - Ranaghat, Town – Santipur, Dist. – Nadia, West Bengal – 741404 (D.El.Ed) (Private) (West Bengal Board of Primary Education) (Code No. ERCAPP671)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The objective of the trust deed is silent about opening of SUM college of Education or opening of any teacher training institute.

  2. State Govt has not recommended as building plan is not approved by the competent authority and it is not as per the NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


16

ER-123.2.8(i).8

ER-122.8(i).62

Dayal Krishna D.Ed. College, Plot No. – R.S. & L.R. 3514, Vill. – Bagagoria, Po. – Barnia, Dist. – Nadia, West Bengal – 741156 ((D.El. Ed.)(Private) (West Bengal Board of Primary Education) (Code No. ERCAPP748)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. State Govt has not recommended the institution as the construction of building is not yet started.

  2. Mutation Certificate issued by the competent Govt authority not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


17

ER-123.2.8(i).9

ER-122.8(i).63

ACME Academy B.Ed. Division, Plot No. 177, 180,181, Vill/Po. – Kalna, Tehsil/Taluka – Dharmadanga Hatkalna Anchal, Town/City – Kalna, Dist. – Bardhaman, West Bengal – 713409 (B.Ed) (Private) (The University of Burdwan) (Code No. ERCAPP679)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. In building plan the old Plot 177 and 179 as per gift deed is meant for English Medium School.

  2. The building plan submitted on the Plot No. 177, 179 meant for ACME Academy English Medium School as per the gift deed not approved by the competent Govt authority.

  3. Notarised Change of Land Use Certificate issued by the competent Govt Authority not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


18

ER-123.2.8(i).10

ER-122.8(i).64

NBS College of Education, Plot NO. – 21, Vill. – Saulapara, Po. – Karjeepara, Tehsil/Town – Jalpaiguri, Dist. – jalpaiguri, West Bengal – 735101 (B.Ed) (Private) (University of North Bengal) (Code No. ERCAPP675)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The institution is required to submit the site plan to indicate that the plots are in contiguous in nature issued by the Competent Govt authority.

  2. Building plan submitted by the institution not countersigned by the competent Govt authority as per NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


19

ER-123.2.8(i).11

ER-122.8(i).65

Dinabandhu B.Ed. College, Plot No. 438, 451, Vill. – Ragunathpur, Po. – Paligram, Tehsil/Taluka – Mangalkote, Dist. – Bardhaman, West Bengal – 713128 (B.Ed) (Private) (The University of Burdwan) (Code No. ERCAPP687)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The institution is required to submit a site plan duly issued by the competent Govt authority that all the plots are contiguous in nature.

  2. In the English version of the sale deed in the scheduled the L R Khatian No. differs although the plot No is the same. The institution is required to clarify the same.

  3. Building plan submitted by the institution is not countersigned by the competent Govt authority as per NCTE Regulations.

  4. Undertaking not submitted by the institution.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


20

ER-123.2.8(i).12

ER-122.8(i).66

Dr. Bimal Chandra Sl. College of Education, Plot NO. – 359, 364, Vill/Po. – kanjiakhali, Tehsil – Uluberia 1, Town- Uluberia, Dist. – Howrah, West Bengal – 711315 (B.Ed) (Private) (Calcutta University) (Code No. ERCAPP676)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Building plan submitted by the institution is not countersigned by the competent Govt authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


21

ER-123.2.8(i).13

ER-122.8(i).67

Narendranath College of Teacher Education, Plot No. – 184, 186, 207, Vill. – Sadullyachak, Po. – Barabari (South), Tehsil/Taluka – Bhagwanpur – II, Town/City – Contai, Dist. – Midnapore, West Bengal – 721430 (B.Ed) (Private) (Vidyasagar University)

(Code No. ERCAPP582)

The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Original certified copy of registered land documents not submitted.

  2. Institution is required to submit a site plan from competent Govt authority that all the plots are in contiguous in nature.

  3. Notarised copy of Change of Land Use Certificate issued by the competent Govt Authority not submitted.

  4. In building plan, total built up area is 1440 sqm which is less than the required as per NCTE norms.

  5. The institution is required to submit building completion certified as per the prescribed format (copy enclosed)

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


22

ER-123.2.8(i).14

ER-122.8(i).68

The Institute for Academic Excellence, Plot NO. – 79, 87, 82/289, Vill. – Imam Patna, Po. – Loha Baran Chak, Town/City – Kharagpur, Dist. – Midnapore, West Bengal – 721437 (B.Ed) (Private) (Vidyasagar University) (Code No. ERCAPP517)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Building plan submitted by the institution does not indicate total area, built up area, plot No, Khata No date of issue etc as per NCTE norms.

  2. The institution is required to submit a site plan about the contiguity of the different plots from the competent Govt authority.

  3. Mutation Certificate by the competent civil authority not submitted by the institution.

  4. Building completion certificate issued by the District Engineer does not indicate date & No. The institution is required to submit building completion certificate as per the prescribed format

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


23

ER-123.2.8(i).15

ER-122.8(i).69

Indira Gandhi Memorial B.Ed. College, Plot No. – 623, 624, 2132, Vill./Po. – Sonatala, Tehsil/Taluka – Uluberia, Town/City – Udaynarayanpur, Dist. – Howrah, West Bengal – 711412 (B.Ed) (Private) (University of Calcutta) (Code No. ERCAPP718)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. The institution is required to submit a site plan from the competent Govt authority that all the plots are contiguous in nature.

  2. In the Sale Deed (English Version) Dr. Sunit Ranjan Karkar has been mentioned as the vendor in place of vendee and Sri Jaydev Charakbarty has been mentioned as vendee in place of vendor as per the sale deed. This may be clarified.

  3. The institution may clarify whether the land sold by the Co-Asst Secretary Sh Jaydev Chakraborty is in the name of Sonalaka Milan Sangh.

  4. In Memorandum of Association “Sonatala Milan Sangh” aims and objectives nowhere establishment of teacher training institution is mentioned.

  5. Building plan submitted by the institution is not countersigned by the competent Govt authority as per the NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


24

ER-123.2.8(i).16

ER-122.8(i).70

Alipurduar B.Ed Training College, Plot.no-LR 1648,1649(P), & 1650(P), Vill-Pakuritala, Po-Tapshikhata, Tehsil/Taluka- Alipurduar, Town/City- Alipurduar, State Dist-Jalpaiguri(WB), Pin-736121 (B.Ed) (Private) (University of North Bengal) (Code No. ERCAPP635)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. Building plan prepared by the approved Civil Engineer / Architect and certified by the competent Govt authority be submitted as per NCTE norms.

  2. The institution is required to submit building completion certified as per the prescribed format (copy enclosed)

  3. Notarised copy of Change of Land Use Certificate issued by the competent Govt Authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


25

ER-123.2.8(i).17

ER-122.8(i).71

BMA COLLEGE, Plot No. 1703, Main Road, Vill/Po- Baheri, Dist.- Darbhanga, Bihar – 847105 (B.Ed) (Constituent Unit of B.N Mandal University) (L.N. Mithila University)

(Code No.  ERCAPP433)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The institution is required to submit a site plan from the competent Govt Authority that all plots are in contiguous in nature

  2. The building plan does not reflect Multipurpose Hall, Principal Office, Common Room for girls / boys etc as per NCTE norms. The institution is required to submit the building plan duly prepared by Civil Engineer / Architect and certified by the competent Govt authority as per NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


26

ER-123.2.8(i).18

ER-122.8(i).72

Chandrasheel College of Education, Plot No.- 9427, 9432, Street No.- Kanti Kasw, Vill/ Po.- Kanti, Tehsil/Talika- Kanti, Dist.- Muzaffarpur, Bihar- 843109 (B.Ed) (Private) (BRA Bihar University) (Code No.  ERCAPP695)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. In site plan submitted by the institution, plot Nos are not reflected and it is not countersigned by competent Govt Authority.

  2. Building plan submitted by the institution is not as per the NCTE norms and it is not countersigned by the competent Govt authority.

  3. Site plan reflects that both the plots are not contiguous and a PVT road is going in between, which is not permissible as it may create non-conducive atmosphere in the campus and free entry of outsiders may create disturbance in the institution.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


27

ER-123.2.8(i).19

ER-122.8(i).73

B P Azad College of Education, Plot No.- 25, Khasra No.- 30, Vill/Po.- Bahadurbigha, Thesil/Taluka- Sadar Gaya, Dist.- Gaya, Bihar- 823002 (B.Ed) (Private) (Magadh University)

(Code No.  ERCAPP639)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The institution has only submitted the Bank Certificate but not the Original FDRs of Endowment fund & Reserve Fund of Rs.5 Lakh and 3 Lakh respectively from nationalized bank as per NCTE Regulations.

  2. The building plan submitted by the institution is not countersigned by the competent Govt. Authority.

  3. The institution is required to submit Non-Encumbrance Certificate from the Competent Govt. Authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.



28

ER-123.2.8(i).20

ER-122.8(i).74

Paramount Teachers Training College, Vill- Silout, Vimal, Po- Silout, Tehsil/Taluka- Kudhani, City/Dist.- Muzaffrpur, Bihar- 843119 (B.Ed) (Private) (B.R.A. Bihar University)

(Code No.  ERCAPP750)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).



29

ER-123.2.8(i).21

ER-122.8(i).75

Ram Kripal Singh Teacher Training College, Plot No.- 1005, 1009, 1004, Street No.- NH-31, Vill- Araut, PO- Wene, Tehsil/Taluka- Chandi, City- Harnaut, Dist.- Nalanda, Bihar- 803110 (B.Ed) (Private) (Magadh University)

(Code No.  ERCAPP786)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

1. The building plan submitted by the institution not countersigned by the Competent Govt. Civil Authority.

2. The institution is required to submit original FDRs of Rs.5 Lakh and Rs.3 Lakh as Endowment Fund and Reserve Fund respectively of State Bank of India as in place of certificate from the bank.

3. The institution is required to submit a building completion certificate by the competent authority as per the prescribed format (copy enclosed).

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.



30

ER-123.2.8(i).22

ER-122.8(i).76

Mahatma Buddha Teachers Training College, Vill- Dhrub Nagar, Panchmile, Po- Kamaldah, Tehsil/Taluka- Bathnaha, City/Dist.- Sitamarhi, Bihar- 843322 (B.Ed) (Private) (BRA Bihar University) (Code No.  ERCAPP587)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

1. The Building Plan submitted by the institution not countersigned by the competent Govt. Civil Authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.



31

ER-123.2.8(i).23

ER-122.8(i).77

Rameswar Singh Teacher Training College, Vill- Pandey Parsawan, Po- Pandey Parsawan, Tehsil/Taluka- Magadh Medical College, Dist- Gaya, Bihar- 823001(B.Ed) (Private) (Magadh University) (Code No.ERCAPP806)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


32

ER-123.2.8(i).24

ER-122.8(i).78

Bharti Shikshak Prasikshan Mahavidyalaya, Vill- Sadatpur, Po- Koluha pagambarpur, Tehsil/Taluka- Muzaffarpur, Dist- Muzaffapur, Bihar- 843108 (B.Ed) (Private) (Bhimarow Ambedkar Bihar University) (Code No.  ERCAPP796)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. Building Plan submitted by the institution does not contain the counter signature of the competent Govt. Authority.

  2. A certificate from the Dist. Education Officer that no other educational institution is functioning in Plot No.347 which is meant for the proposed Bharti Shikshak Prasikshan Mahavidyalaya.

  3. A copy of the resolution passed by the Shiksha Samiti to run B.Ed. Course in Khata No.347.

  4. The institution has submitted Non-Encumbrance Certificate in the name of Sh. Mahesh Prasad i.e. individual. It must be in the name of the institution.

  5. The institution is required to submit a building completion certificated as per the prescribed format.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.



33

ER-123.2.8(i).25

ER-122.8(i).79

Triveni College of Education, Vill- Kunti Nagar Near Police Line, Po- Nawada, Dist- Nawada, State- Bihar – 805110 (B.Ed) (Private) (Magadh University) (Code No.  ERCAPP461)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The revised building plan submitted by the institution is not countersigned by the competent Govt. Authority as per the NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.



34

ER-123.2.8(i).26

ER-122.8(i).80

School of Educational Studies, Village Patia, Post- KIIT, City-Bhubaneswar, Dist.- Khordha, Orissa – 751 024 (B.Ed) (Deemed University) (Code No.  ERCAPP605)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The lease deed at Page.4 clearly States that IPCO Plot No.15 of Industrial Estate Chandka in favour of M/s Kalinga Institute of Industrial Technology (KIIT) for establishment of Degree Engineering College, not School of Educational Studies (B.Ed. Course)

  2. The institution has not submitted building plan as per the NCTE norms exclusively for School of Educational Studies instead submitted a landscape plan.

  3. Site plan does not indicate the area earmarked for School of Educational Studies (B.Ed) and it is not signed by the Competent Govt. Authority.

  4. Notarized copy of change of land use certificate issued by the competent Govt. Authority not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


35

ER-123.2.8(i).27

ER-122.8(i).81

Aditya Prakash Jalan Teachers Training College, Plot No- 1125, Vill- Kudlun, Po- Balalong, Tehsil- Ratu, City- Ranchi, Dist- Ranchi, Jharkhand- 834004 (B.Ed) (Private) (Ranchi University) (Code No.  ERCAPP696)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The institution has not submitted original certified copy of land documents.

  2. The institution is required to submit building plan approved by the competent Govt. Civil Authority, mentioning, Plot No., Khata No., Total Area, Built-up area as per the NCTE norms.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.



36

ER-123.2.8(i).28

ER-122.8(i).82

Manrakhan Mahto B.Ed. College, Vill- Kedal, Po- Neori Vikas, Tehsil/Taluka- Kanke, Dist- Ranchi, State- Jharkhand- 825217 (B.Ed) (Private) (Ranchi University) (Code No. ERCAPP498)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


37

ER-123.2.8(i).29

ER-122.8(i).83

Chanakya Teachers Training College, Plot No- 506, Vill- Sapaha, Po- Madhupur, Tehsil/Taluka- Madhupur, City- Madhupur, Dist.- Deoghar, Jharkhand- 815353 (B.Ed) (Private) (Sidho Kanho Murmu University) (Code No.ERCAPP458)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


38

ER-123.2.8(i).30

ER-122.8(i).84

BBM B.Ed. College, Sardaha, Vill/Po- Sardaha, Tehsil/Taluka- Chas, Dist- Bokaro, State- Jharkhand- 827013 (B.Ed) (Private) (Vinoba Bhave University) (Code No.ERCAPP510)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. A site plan duly counter signed by the competent Govt. Authority relating to Plot No.788, 813, 797 with Khasra No.67, 44 are contigeous in nature.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


39

ER-123.2.8(i).31

ER-122.8(i).85

Mother Ziramani Teachers Training College, Plot No.- 829 & 830, Vill- Gunja, Po- Hendebili, Tehsil/Taluka- Ormanjhi, City/Dist.- Ranchi, Jharkhand- 835219 (B.Ed) (Private) (Ranchi University) (Code No.  ERCAPP685)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


40

ER-123.2.8(i).32

ER-122.8(i).86

Dinesh College of Education, Plot No.- 696, Vill- Farathiya, Po- Hoor, Tehsil/Taluka- Garhwa, City/Dist.- Garhwa, Jharkhand- 822114 (B.Ed) (Private) (Nilamber Pitamber University)

(Code No. ERCAPP530)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


41

ER-123.2.8(i).33

ER-122.8(i).87

Primary Teachers Training Institute, Vill- Tokipur, PO- Sukjora, Tehsil/Taluka- Raneshwar, City/Dist.- Dumka, Jharkhand- 814101 (B.Ed) (Private) (Jharkhand Academic Council) (Code No. ERCAPP797)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Land possession certificate submitted by the institution is in the name of the individual not in the name of the institution.

  2. Notarized copy of change of land use certificate mentioning Plot No., Khata No., Total Area, etc. issued by competent Govt. Authority not submitted by the institution.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


42

ER-123.2.8(i).34

ER-122.8(i).88

The Agartala College of Education, Pl.no- 105,107,109,110, Street.No- Priyatilla, Vill-Chand Mari, Po-Kunjaban, Tehsil/Taluka-Indra Nagar, Town/City- Agartala, Dist- West Tripura (TR), Pin Code-799006, State- Tripura (B.Ed) (Private) (Code No. ERCAPP702)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Certified copy of land document not submitted by the institution.

  2. The Building Plan must be in the name of the institution and it must be duly countersigned by the competent Govt. Authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


>

43

ER-123.2.8(i).35

ER-122.8(i).89

Sazolie College of Teacher Education, Street/Road-Phezhu, Vill/Town/City-Jotsoma, po-Phezhu, jotsoma, Tehsil/Taluka-Phezhu, Town/City-Kohima, State-Nagaland, Dist-Kohima (NL), Pin-797002 (B.Ed) (Private) (Nagaland University)

(Code No. ERCAPP465)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Original Fixed Deposit Receipt of Rs.5 Lakh towards Endowment Fund and Rs.3 Lakh towards Reserve Fund from nationalized bank not submitted by the institution.

  2. Original Certified copy of land document not submitted and Plot No. is not mentioned in the land document.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


44

ER-123.2.8(i).36

ER-122.8(i).90

Kadomani D.Ed. College, Plot No.817, Vill-Kamalpur, PO-Meherapur, Tehsil/Taluka-Kaliachak, Town/City-Malda, State-West Bengal, Dist-Malda, West Bengal-732207 (D.El.Ed.) (Private) (West Bengal Board of Primary Education)

(Code No. ERCAPP524)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. The aims and objects of the memorandum of Association of “Konika Academy” the establishment of training college or training institution is not indicated.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


45

ER-123.2.8(i).37

ER-122.8(i).91

Sister Nivedita Primary Teacher Training Institute, Plot No.7, Street1, Vill/Town/City-Barreriya, PO-Pathardih, Tehsil/Taluka-Pathardih, Town/City-Purulia, Dist-Purulia, West Bengal-723152(D.El.Ed.) (Private) (West Bengal Board of Primary Education) (Code No. ERCAPP598)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. In the aims and objects of the memorandum of Association of “Sister Nivedita Old Age Home” the establishment of the training college or training institution is not indicated.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


46

ER-123.2.8(i).38

ER-122.8(i).92

Radha Gobinda BED Teacher Training College, Plot.no-LR 1382,1383,1381,1385, Vill-Jhapandanga, Po-Keotara, Tehsil/Taluka-Panchsimul, Town/City-Keotara, Dist-Bardhaman (WB), Pin-713166, State-West Bengal (B.Ed) (Private) (University of Burdwan) (Code No. ERCAPP626)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. Building plan submitted by the institution is not countersigned by the competent Govt. Authority as per NCTE regulations.

  2. Building Completion Certificate in the prescribed format (copy enclosed).

  3. Site plan submitted by the institution is not counter signed by the competent Govt. Authority.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


47

ER-123.2.8(i).39

ER-122.8(i).93

Babu Jagjivan Ram Memorial College, Plot No. -665, Vill. – Bansipur, Po. – Chopa, Town/City – Gurap, Dist. – Hooghly, West Bengal – 712308 (B.Ed) (Private) (University of Burdwan) (Code No. ERCAPP622)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The original fixed deposit receipt for Rs.5 lakh towards Endowment Fund from Nationalized bank not submitted.

  2. Building plan submitted by the institution not countersigned by the competent Govt. Authority.

  3. In the aims and objects of the memorandum of Association of “Dhaniakhali Depressed Classes League” the establishment of training college or training institution is not indicated.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


48

ER-123.2.8(i).40

ER-122.8(i).94

The Front Page College of Education B.Ed. Plot No.3458-3463, Vill-Dewanati, PO-Hadipur, Tehsil/Taluka-Hadipur, Town/City-Deganga, State-West Bengal, Dist-North 24 Parganas (WB), Pin-743443 (B.Ed) (Private) (West Bengal State University)

(Code No. ERCAPP585)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


49

ER-123.2.8(i).41

ER-122.8(i).95

Seva Varati B.Ed. College, Plot No. 246, Vill/Po. – Nabipur, Tehsil/Taluka – Domkal, Town/City – Berhampore, Dist. – Murshidabad, West Bengal – 742308 (B.Ed) (Private) (Kalyani University) (Code No. ERCAPP612)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


50

ER-123.2.8(i).42

ER-122.8(i).96

Swami Vivekananda College of Education, Plot No. – 597, 587/620, 607, Vill. – Baje Bindole, Po. – Bindole, Tehsil/Taluka – 4 No. Bindole Gram Panchayet, Town/City – Raiganj, Dist. – Uttar Dinajpur, West Bengal – 733156 (D.El. Ed.) (Private aided) (West Bengal Board of Primary Education)

(Code No. ERCAPP711)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


51

ER-123.2.8(i).43

ER-122.8(i).97

Hemchandra Memorial Primary Teachers Training Institute D.Ed., Plot No. 529, 528, vill. – Narasinghapur, Po. – Sagarpara, Dist. – Murshidabad, West Bengal – 742306 (D.El. Ed.) (Private) (West Bengal Board of Primary Education)

(Code No. ERCAPP648)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. State Govt. has not recommended the case for establishment of the institute as the construction of the building is not yet completed.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


52

ER-123.2.8(i).44

ER-122.8(i).98

Sagarpara Educational PTTI D.Ed. Plot No.1530, Vill/PO-Sagarpara, Tehsil/Taluka-jalangi, Town/City-Berhampore, State-West Bengal, Dist-Murshidabad (D.El.Ed.) (Private) (West Bengal Board of Primary Education)

(Code No. ERCAPP531)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. The State Govt. has not recommended the case for establishment of the institution as the construction of the building not yet started.

  2. The Mutation Certificate submitted by the institution no where the name of the institution is mentioned. It is in the name of the individual.

  3. The Non-Encumbrance Certificate issued by the competent Govt. Authority not submitted by the institution.

  4. Notarized copy of change of land use certificate issued by competent Govt. Authority not submitted.

  5. A copy of Power of Attorny given to Md. Abdul Jalaluddin from the owner. Anima hahari and others has not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.

53

ER-123.2.8(i).45

ER-122.8(i).99

Annapurna Memorial College of Education, Plot No. LR 3806, Vill. – Kashinagar, Po. – Kak-Kalinagar, Tehsil/Taluka – Kashinagar, Town/City – Kakdwip Dist. – South 24 Parganas, West Bengal – 743347 (B.Ed) (Private) (Calcutta University)

(Code No. ERCAPP544)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).


54

ER-123.2.8(i).46

ER-122.8(i).100

Sagarpara Teachers Training Institute, Plot No.LR8845, 8848, 8847, 8854, 8855, Vill-Sagarpara, PO-Sagarpara Tehesil/Taluka-Jalangi, Dist-Murshidabad (WB), State – West Bengal- 742306 (D.El.Ed.) (Private) (West Bengal Board of Primary Education)

(Code No. ERCAPP623)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents:-

  1. In sale deed the name of the secretary was not mentioned and also it was mentioned that the Secretary of Managing Committee and or Executive Committee here in after called the vendee. Clarification may be given whether both the Committees are the same along with the Secretary.

  2. A resolution from Sagarpara Assembly of Various Education (SAVE) trust to authorize secretary Hazzazul Islam to Sale the land to Sagarpara Primary Teachers Training Institute.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


55

ER-123.2.8(i).47

ER-122.8(i).101

Kumri Vivekananda PTTI, Plot No.2481, 2483 (sabak), 1796, 1797(Hal), Vill-Kumri (Mathpara), PO-Gopalpurghat, Tehsil/Taluka-Harekrishnapur, Dist-Nadia(WB), State-West Bengal-741122 (D.El.Ed.) (Private) (West Bengal Board of Primary Education) (Code No. ERCAPP580)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. The Committee considered the reply of the institution and deliberated the case in detail as per provisions of the NCTE Act, Rules & Regulations. The Committee decided that the institution be asked to submit the following documents :-

  1. Certified copy of registered land document not submitted.

  2. Notarized copy of change of land use certificate issued by the competent Govt. Authority not submitted.

The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.

Hence the ERC decides to seek above details/clarification under section 14(3) (b) of the NCTE Act on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.

56

ER-123.2.8(i).48

ER-122.8(i).102

Prabhat Jyotirmoyee College of Education, Plot No.-535, 536, 537, /1020 Street No.-Suri – Asansol, Vill-Abdarpur, PO-Suri (Barbagan), Tehsil/Taluka-Suri, Town/City-Suri, Dist-Birbhum (WB), Pin-731103, State-West Bengal (D.El.Ed.) (Private) (West Bengal Board of Primary Education) (Code No. ERCAPP678)


The original file of the institution viz-a-viz provisions of the NCTE Act, Rules, Regulations and guidelines issued by NCTE-HQrs from time to time were considered by ERC.

The Committee noted that a deficiency letter was issued to the institution. the Committee considered the reply of the institution found the same to be satisfactory ,therefore, the ERC decides that the application of the institution be processed further by deputing the Visiting Team so as to verify the infrastructure & instructional facilities of the institution as per provisions of the NCTE Regulations, 2009.

As per provisions of the clause 7(4) of the NCTE Regulations, 2009, the institution shall be required to provide details about the infrastructure etc. on the duly filed up proforma available on ERC, NCTE website to the Visiting Team at the time of inspection along with building completion certificate and an undertaking as per the prescribed format. (A copy of the prescribed formats are available on the ERC, NCTE website).

  

Any other matter with the permission of Chair

ERCAPP73

Shahid Sheikh Bhikari College of Education, Vill- Sutiyambe, Po- Pithoria, Tehsil – Kanke, Dist- Ranchi, Jharkhand

The ERC called for the file of the institution and found that the staff position of the institution is inadequate i.e. one lecturer in “Teaching of Mathematics” and two in “Teaching of different languages” are not reflected in the staff list submitted by the institution.


A list of qualified faculty duly appointed as per the provisions of the NCTE Regulations 2009 indicating qualification, percentage of marks, teaching experience etc. countersigned by the Registrar of affiliating university alongwith attested copy of professional qualification & experience certificate (as per the format enclosed).


The institution shall submit the above details/ clarification alongwith all necessary documents accompanied with an Affidavit in support of reply of the above points.


Hence, the ERC decided that the decision taken by ERC in 119th meeting for issue of 7 (11) may be kept in abeyance and decides to seek above details/clarification & issue Show Cause Notice to the institution under section 14 (3) (b) of the NCTE Act due to non-compliance of conditions as laid down u/s 7(9) of the NCTE Regulations, 2009 on the above points and direct the institution to submit the reply as per provisions of the NCTE Act, Rules & Regulations within 21 days.


Civil Review No. 19 of 2011 in CWJC No. 10084/2010 filed by the NCTE and Ors Vs State of Bihar & Ors with MJC No. 299 of 2011 filed by Magadh Teachers Training College Vs State of Bihar in the Hon’ble High Court at Patna. (05-469/2010)

The matter was placed before the ERC in its 123rd ERC meeting. It was decided that as it leads to contempt case urgent step may be taken for sending Visiting Team as per direction of Hon’ble High Court, Patna to Magadh Teacher Training College, Gaya, Bihar.

As the withdrawal order has been confirmed by the Appellate Authority, NCTE-HQrs, New Delhi vide order dated 05.05.2010, this matter be reported to NCTE-HQrs for post facto approval. Action may be taken immediately under intimation to NCTE-HQrs.

                                 Volume II of the Agenda could not be taken up for want of time.

      The meeting ended with a vote of thanks to the Chair.

  

       ( Dr. Ram Kishor )                                                                          ( Prof.(Dr.) P.C. Mahapatra)

                                     Convener                                                                                            Chairperson