The 112th Meeting of the Eastern
Regional Committee (ERC), National Council for
Teacher Education (NCTE) was held on 30thSeptember
– 1October 2010 at Conference Hall, ERC, NCTE,
Bhubaneswar. The Regional Director, ERC Dr.
H.S. Tripathi welcomed the Chairperson, ERC
Prof. J.C. Soni and all the members of Committee
present in the meeting.
With the permission of the Chairperson, ERC, Dr.
H.S. Tripathi, Regional Director (Convener), ERC
placed the agenda notes of 112th
meeting before the Committee. The Members of the
Eastern Regional Committee perused & considered
all the cases and taking into consideration the
recommendations made by the Members, the
Eastern Regional Committee considered & decided
the following matters/cases as per the
proceedings noted below:-
Agenda Item: ER-112.1 Circulation of the
Proceedings of 111th Meeting of ERC held
on 16-17 September, 2010.
|
Sl. No. |
Agenda Item No. |
Contents |
Decision of ERC |
|
1 |
1 |
Proceedings of 111th ERC Meeting
placed before the ERC for circulation. |
The Proceedings of the 111th ERC
Meeting held on 16-17 September, 2010
were received and seen by the ERC members.
The minutes will be confirmed in the next
general ERC meeting. |
Agenda Item ER-112.5.1 - 112.5.15 (As per deferred
cases of 111th ERC Meeting – ER-111.5.1
- 111.5.15 Vol.-IV of Visiting Team Reports)
|
Sl. No. |
Agenda Item No. |
Name & address of the institution,
Course, Name of Affiliating body, Code No. |
|
2 |
1 |
Lieutenant Abhishek Ray Chaudhuri Teacher’s
Training College, Vill – Chandpur,
PO – Sonarpur, Dist – South 24 Parganas,
West Bengal – 700 150 (B.Ed)(Private) (University
of Calcutta) Code No. ERCAPP142 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
The institution has submitted a certificate
from Gram Pradhan in support in support
column 5 of the affidavit.
2.
Possession / mutation certificate in support
of land document is required to be
submitted.
3.
Multipurpose hall mentioned in the VT Report
i.e. 141.43 Sq. Mts. which is less as per
NCTE norms.
4.
The land should be in the name of the
institution but as per VT Report, the land
is in the name of the trust i.e. Prasanta
Kumar Baidya Seva Trust.
5.
The institution has proposed the
building/ college in three different plots
i.e. 280, 279 & plot no. 639 measuring
2684.94 Sq. Mts. is located at a distance of
0.5. K.M. from the above two plots having
building construction as per VT
Remarks.
6.
The institution has not submitted the
original Affidavit on Rs.100/- stamp paper
regarding selection committee for
recruitment of the teaching staff.
7.
The institution has not submitted the
original Affidavit on Rs.10/- stamp paper
regarding individual teaching staff.
8.
Eight Nos. of computers are available as per
VT Report.
9.
Laboratory equipments are not sufficient as
per VT Report.
10.
The institution does not have more
references and textbooks on education and
subscribe for more number of journals and
periodicals as per VT remarks. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
The multipurpose Hall is 141 sqmts., less
than the NCTE norms and as per office note
page 4, the land is not in one Plot nor it
is adjacent and as such, it has been decided
to notice under section 14(3)(b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
3 |
2 |
Dakshin Dinajpur B.Ed. College, Vill –
Fulbari, P.S. – Gangarampur, Dist – Dakshin
Dinjapur – 733140, West Bengal, (B.Ed.)
(Private) (University of Gour Banga) Code
No. ERCAPP333 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
As per VT Report Science Lab,
Psychology Lab, Language Learning Lab are
not working properly.
2.
As per VT Report, there are
Computer-3, UPS-3, TV-1 in ET Lab and
Terminal –Student Ratio is 1.33.
3.
As per VT Report, Equipments
/consumables are yet to be procured.
4.
The change of land use certificate by
SDL & LRO is not notarized and is also after
the date of submission of application i.e.
15.01.2010
5.
The land is certified after the date
of submission of application i.e.
08.02.2010.
6.
The building plan and the building
completion certificate submitted is not
approved by the competent civil authority.
7.
Built up area not mentioned in the
building plan
8.
The date of Registration of land is
not mentioned in the affidavit.
9.
Non encumbrance Certificate from SDL
&LRO issued on 17.01.2010 after the
submission of application.
10.
The institution has not submitted the
certificate of the registration of the
society only a paper showing bye-laws has
been submitted.
11.
As per the paper of the society are
not submitted, it is not clear as to whether
the person filing an application is
authorized representative of the society or
not.
12.
As per the VTR, the lands possess by
the institution is 4160 sqft.
13.
The VT is not clear about the
construction of the building whether it is
as per bye-laws or not.
14.
The library is to accommodate 30
student. The library has 2029 books of which
2000 are related to education.
15.
The CLU dt. 15.01.2010 is not duly
stamped with Govt. Seal and has been issued
after due date.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
Page 79-80, observation of the VT members
categorically speaks that the building is
under construction. Issue notice under
14(3)(b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
4 |
3 |
D.L. Roy Women Primary Teacher’s Training
Institute, PO – Krishnagar, Town/City –
Krish nagar, Dist – Nadia, West Bengal –
741101, (D.Ed.) (Govt.) (West Bengal Board
of Primary Education) Code No. ERCAPP130 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
Built up area mentioned in Affidavit
and application is less than as per NCTE
norms. As per VTR, Built up area is less
than as per NCTE norms i.e. 832 Sq.ft.
2.
As per VTR, Size of the Multipurpose
hall is less than as per NCTE norms i.e. 247
Sq.ft.
3.
As per VTR, Size of the Library cum
reading Room is less than as per NCTE norms
i.e. 226 Sq.ft. and Library seat is not
sufficient as per norms
4.
As per VT Report, Hall is under
Construction.
5.
As per VT Report, Language Learning
Lab is not available.
6.
As per VT Report, Practice of
teaching school is 06 and NOC from the
schools are not submitted.
7.
Certified copy of the registered land
documents from competent authority.
8.
Approved building plan with Plot No.,
Khata No, Khesra No, Total area, not from
competent civil authority.
9.
Notarized copy of change of land use
certificate issued by the competent
authority.
10.
Undertaking not submitted in the
prescribed format.
11.
Non-encumbrance Certificate from
Revenue Authority.
12.
Enclosure regarding column 5 of the
affidavit not submitted.
13.
Building completion certificate with
the Plot number, Khata No., total area &
built up area from competent civil authority
not submitted.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
The built-up are is 8956 sq.ft., less than
the NCTE norms, issue notice under Section
14(3) (b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for D.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
5 |
4 |
Bara Andulia Govt. Primary Teachers’
Training Institute, PO – Bara Andulia, PS –
Chapra, Dist – Nadia, West Bengal – 741124,
(D.Ed.) (Govt.) (West Bengal Board of
Primary Education) Code No. ERCAPP389 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
As per VTR Pg. 100, infrastructure is
not as per NCTE norms. Multipurpose hall, ET
lab. is not available. Furniture is not
available.
2.
As per VTR, Size of the Library cum
reading Room is 608.4 Sq.ft.
3.
As per VTR, No separate Science lab
is available. Science Lab. is combined with
Psycho-Geography.
4.
As per VTR, No. of Books of the
Library is 1251., Details of title of the
books is not mentioned in the VTR as
indicated “separately counted”.
5.
Certified copy of the registered land
documents issued by the competent authority.
6.
Notarized copy of change of land use
certificate issued by the competent
authority.
7.
Approved building plan with Plot No.,
Khata No., Khesra No., total area, built up
area from competent civil authority.
8.
Duly filled in affidavit on Rs. 100/-
stamp paper (in original) in prescribed
format.
9.
Enclosure regarding column 5 of the
affidavit.
10.
Building completion certificate with
the Plot number, Khata No., total area &
built up area from competent civil
authority.
11.
Non-encumbrance Certificate from
Revenue Authority.
12.
Undertaking in prescribed format.
13.
Covered area/Plinth area not
mentioned in building plan.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
The VT reports and the records by the
institution, it is apparent that the
built-up area and land as per the NCTE norms
in view of the affidavit given by the
Principal Govt. PTTI, but as there is no
provision of Multi Purpose Hall, issue
notice under Section 14(3) (b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for D.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice. |
|
6 |
5 |
Parjanya B.Ed. College, Vill.- Paharpur,
Po.- Baliapur, City-Dhanbad, Dist.- Dhanbad,
Jharkhand- 828201, (B.Ed.) (Private-Aided) (Vinoba
Bhave University) Code No. ERCAPP240 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
The institution has not identified the rooms
for the instructional facilities i.e.
classrooms, laboratories, halls etc. and the
instructional space available in the
institution is not as per NCTE norms.
2.
Sports facilities have not been provided in
the institution
3.
Equipments / tests in Science lab,
Psychology lab, ET Lab Language lab not
provided at all by the institution.
4.
Books and journals not provided at all in
the library
5.
The institution has not made arrangements
for practice teaching.
6.
The institution has not created its website.
7.
The size of library is only 400 sq.ft as
against requirement of accommodation for 50
students as per Regulations.
8.
As per the VT Members, the institution has
not provided furniture, teaching aids etc in
the institution.
9.
As regards books and journals in the
library, the number falls short of
requirement of 3000 books and 1000 titles as
per Regulations.
10.
As per the VT Report, the institution has
provided only six computers in the ET lab.
11.
The VT Members have further stated : The
proposed B.Ed college is a three storeyed
building. Two floors completed. 2nd
floor rooms are lacking plaster. The
college building area is not demarcated.
The Electricity is not yet reached to the
proposed B.Ed College. Drinking water
facility is not found.
12.
As per the sale deed dated 12th
October 2010, the sale deed is for a
residential land. In support of CLU, the
institution had submitted a certificate
issued by the Circle Officer, Baliapur,
Dhanbad on 19th Jan 2010 i.e.
after the last date of submission of
application stating that the land is useful
to the college, which is not acceptable.
13.
The Non-Encumbrance certificate has
been issued on 19th Jan 2010 i.e.
after the last date of submission of
application.
14.
The certified copy of land documents
have been issued on 18th Jan 2010
i.e. after the last date of submission of
application.
15.
In the application form, the website
address and PAN No. of the institution is
not mentioned.
16.
Dates of registration in the
affidavit do not tally with the land
documents.
17.
Mode of possession of land not
clearly mentioned in the affidavit and
Enclosure as per column 5 not submitted.
18.
Total area mentioned in the affidavit
do not tally with an application along with
building plan.
19.
Plinth area mentioned in the building
plan along with completion certificate which
is less than as per required.
20.
Total area not mentioned in the
building completion certificate. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
Page 208, the report of the VT members,
clearly indicate that the building is under
construction not fully in operational stage,
the proposed college is still not demarcated
its land and building, notice under Section
14(3)(b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
7 |
6 |
Krishnagar Govt. PTTI, Nadia, Vill – Krish
Nagar, Dist – Nadia, West Bengal – 741101, (D.Ed.)
(Govt.) (West Bengal Board of Primary
Education) Code No. ERCAPP388 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
List of teaching staff not submitted
by the institution. Information of only one
principal and 2 lecturers submitted in
individual prescribed format
2.
Teachers for Physical & Health
Education, Work Experience & IT Literacy not
available.
3.
No. Journals not as per NCTE Norms.
4.
Science, Psychology and ET lab not
available.
5.
As per VT Remarks 3 No. of computers
and one laptop available.
6.
Language learning lab not available.
7.
NOC of Practice teaching school not
given.
8.
Total built up area less than the
required.
9.
The lecturer hall, laboratories,
library etc were not maintained.
10.
Toilet are not maintained.
11.
Building is permanent and Tin shaded.
12.
Notarized copy of Change of Land Use
Certificate not submitted by the Competent
Authority.
13.
Duly filled affidavit on Rs. 100/-
stamp paper.
14.
Building plan with plot No., khata
No., total area, built up area/plinth area
duly approved by the competent authority not
submitted.
15.
As per affidavit and application form
the built up area less than the required.
16.
Building Completion certificate with
plot No., khata No., total area, built up
area from competent civil authority not
submitted.
17.
Non-encumbrance certificate from
Revenue Authority.
18.
Undertaking not submitted in the
prescribed format. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
As per VT report Page 267, the built up area
is 811 sq.mts, less than NCTE norms, issue
notice under Section 14(3)(b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for D.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
8 |
7 |
District Institute of Education and
Training, Vill/ PO – Sovanagar,
Dist - Malda, West Bengal –
732209, (D.Ed.) (Govt.) (West Bengal Board
of Primary Education) Code No. ERCAPP92 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
List of teaching staff not submitted
by the institution. As per VT Remarks human
resources are regrettably poor.
2.
NOC from competent authority not
obtained.
3.
No indoor and out door games & sports
materials.
4.
Size of the multipurpose hall is
95.92 Sq. Mtr. which is less than required.
5.
Size of classroom 40.51 Sq. Mtr.
Which is less than the required.
6.
Teachers for Physical & Health
Education not available.
7.
No. Books on education, no
encyclopedia alongwith no subscribed journal
available.
8.
Science Lab, Psychology Lab, ET Lab
and Language Learning Lab. not available.
9.
NOC of Practice teaching school not
given.
10.
Seating capacity in the library is
only 12.
11.
Certified copy of the registered land
documents from competent authority.
12.
Approved building plan with Plot No.,
Khata No, Khesra No, Total area and built up
area, covered area/plinth area
13.
Notarized copy of change of land use
certificate issued by the competent
authority.
14.
Affidavit in the prescribed form on
Rs. 100/- stamp paper duly attested by
Oath location of the land (village,
district, state etc), the total area in
possession, the permission of the competent
authority to use the land for educational
purposes and mode of possession i.e.
ownership or lease.
15.
Undertaking not submitted in the
prescribed format.
16.
Non-encumbrance Certificate from
Revenue Authority not submitted.
17.
Enclosure as per Column 5 of
Affidavit of Rs. 100/- not clear
18.
Building Completion Certificate with
the Plot No., Khata No., Total area & Built
up area from competent civil authority not
submitted.
19.
Affidavit of Rs. 100/- is submitted
by the institution is not in prescribed
format. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
The land and built-up area ok, No
provision of Multi Purpose Hall, issue
notice under Section 14(3)(b).
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for D.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
9 |
8 |
Mahabodhi Mahavidyalaya, Plot No. 5279,
Street Number-402, Vill-Muzafarpur, Po-
Nalanda, Dist.- Nalanda, Bihar-803111, (B.Ed.)
(Private) (Magadh University) Code No.
ERCAPP155 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
As per the VT Report, the size of
Multipurpose hall is 1800 sq. ft as against
requirement of 2000 sq ft as per
Regulations.
2.
The infrastructure facilities viz. size of
multipurpose hall, classroom, principal
room, library etc. as mentioned in the
Building plan does not tally with the
details of infrastructure details mentioned
by the VT Members, whereas the VT Members
have stated that the infrastructure
mentioned is the same as in the building
plan.
3.
As per VT Report, the institution is having
only one computer in the ET lab.
4.
In support of resolution of the approving
authority approving the building plan, the
institution had submitted a resolution of
the society stating that 4000 sqm of land is
allotted for B.Ed course.
5.
Alongwith the application form and reply to
DLI, the institution had submitted the
building plan signed by local engineer on 7th
March 07 and approved by Gram Pradhan,
whereas alongwith the VTR, the institution
had submitted the same building plan, which
has been signed by the Executive Engineer,
Housing, Biharsharif, Nalanda in March 2007.
6.
In the application form, the website address
of the institution/society is not mentioned.
7.
In the application form, the institution has
mentioned the PAN No. as CA13, which seems
to be incorrect.
8.
The society applying for the B.Ed college
has been registered in 12th Aug
2004 whereas the land documents have been
registered on 11th April 1978.
9.
As per the Land Possession Certificate
issued on 7th Sept 09, the land
on which the college is being proposed is
Agricultural. In support of Change of Land
use, the institution had submitted an
Affidavit stating that it has demarcated
Khata No. 449 for B.Ed facility.
10.
The Non-encumbrance certificate has been
issued on 25th Jan 2010 i.e.
after the last date of submission of
application.
11.
In the affidavit dated 26.10.09 and also the
application form, the institution has
demarcated Khata No. 449 for the B.Ed
college, whereas in the Affidavit,
Non-Encumbrance Certificate., Building
Completion Certificate, Building plan it has
mentioned seven different Khasra Nos.
12.
In the affidavit, the institution has
mentioned the land area as 11.67 acres,
whereas in the Building plan, it has
mentioned the land area as 5.73 acres.
13.
As per the building plan and Building
completion Certificate, the building has
been constructed at Khata No. 449, 584,
61,125, 218, 405 & 349, Plot No.s 5279,
5155, 5617, 5333, 5334, 5342, 5337 & 5142,
Thana No. 402, whereas as per the
application form, VTR, Affidavit, the
institution has demarcated only Khata No.
449, Plot No. 5279 for the B.Ed College.
14.
The institution is running Degree courses in
the name of Mahabodhi College in the same
premises since 1983. The institution has
not submitted site plan demarcating the area
for the degree college & proposed B.Ed
college.
15.
The size of multipurpose hall is 750 sq.ft
(approx) as against the requirement of 2000
sq ft as per Regulations.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
On physical assessment of CD and relevant
file and VT report, the proposed College is
to function under the umbrella of existing
multi-faculty college without any
demarcation of the proposed institution, it
is clear from the VT report that the
Multipurpose Hall is not as per NCTE norms,
issue notice under section 14(3)(b).
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
10 |
9 |
Kazi Anisur Rehman Academy, Vill- Taldanga,
Po- Chirkunda, Dist- Dhanbad, Jharkhand –
828202, (B.Ed.) (Private) (Sidhu Kanhu Murmu
University) Code No. ERCAPP340 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
As per VTR, total building area is
not as per NCTE norms as per VT Remarks.
2.
The VT Members have stated that the
total built up area actually verified does
not match with the Building plan submitted
3.
Further, the VT Members have stated
that the infrastructure facilities are not
fit as per NCTE norms.
4.
The Website of the institution is not
yet launched.
5.
As per VT Report, the institution has
not made provision for safety measures
during exigency and also the instructional
space is not as per NCTE norms.
6.
Playground is not provided in the
institution.
7.
The institution has provided only
1500 books and 500 titles in the library as
against the requirement of 3000 books and
1000 titles.
8.
The total seating capacity in the
library is only 10 as against 50 required as
per Regulations.
9.
The institution has not made
arrangements for practice teaching.
10.
As per VT Report, the institution has
not obtained the permission of the competent
authority to use the land exclusively for
teacher education course.
11.
Furniture is very poorly provided in
the institution.
12.
As per the details of infrastructure
facilities submitted by the institution, the
size of classrooms is less than 500 sq. ft,
multipurpose hall size is 700 Sq. ft. which
is less as per NCTE norms.)
13.
The VT Members have also stated the
that the building is old which is not as per
NCTE norms. All the rooms are very small
and poor equipped. There is no laboratory,
ICT lab, Seminar Lab, Multipurpose hall,
staff room with poor electrification.
Temporary electrification items are found in
the building. Insufficient space for
movement in the building. Bank statement
not submitted. There is no stock register.
14.
In the application form, PAN No of
the society, Website address of the society/
institution is not mentioned.
15.
The Certified copy of land documents
issued on 24th Nov 2009
submitted, whereas as per Regulations, the
same are to be issued prior to the date of
application.
16.
The institution has given four
different registered land documents with
regard to land, which shows that the land is
not in a single plot.
17.
The institution had submitted the
Non-Encumbrance Certificate from the
Panchayat, whereas it should have been from
the Revenue Authorities.
18.
The Change of Land Use Certificate
has been issued by the Panchayat, which is
not clear. Notarized Change of land use
certificate not submitted. Only the stamp of
the notary has been affixed.
19.
The institution had submitted
different statements with regard to Land and
Built up area on two different affidavits.
On the Affidavit submitted alongwith the
application form, the institution had
submitted the Land Area as 2704.78 sqm and
Built up area as 1551.43 sqm, whereas on the
Affidavit submitted alongwith the reply to
Deficiency letter, the institution had
submitted the Land Area as 2637 sqm and
Built up Area as 1705 sqm. Both the
Affidavits have been attested on the same
date, by same person and even by the same
Notary.
20.
The institution had submitted the
Building plan with the covered area of
18360.72 sq.ft on three floors. The floor
wise built up area is not mentioned. The
plinth area / ground floor of the building
is approx 6120 sq.ft (18360 /3), whereas as
per Regulations, the institution should have
1500 sqm of built up area on the Ground
floor only.
21.
The State Govt recommendation is
negative vide Govt letter dated 21.05.2010.
22.
The information relating to land area
/ built up area appears contradictory and
misleading.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
The VT report at Page 380 speaks that
the building is not at all fit for (B.Ed)
the proposed institution. In page 72, the VT
member clearly mention that in the existing
building, there is no specification of norms
size nor at all fit for the course, notice
for refusal after having 14(3)(b).
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
11 |
10 |
Vidyanagar Govt. PTTI, Vill – Vidyanagar, P
O- Vidyanagar, Dist – Bardhaman, West Bengal
- 741302, (D.Ed.) (Govt.) (West Bengal
Board of Primary Education) Code No.
ERCAPP138 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
The Size of Multipurpose Hall
was 1055 Sq. ft.
2.
The Size of the Classroom is 1055 Sq
ft.
3.
The Size of Library Room was 86
Sq.ft.
4.
The books in the Library are less.
5.
As per the VT Report, there are seven
numbers of computer.
6.
The institution not mentioned the
information regarding “the institution
campus, buildings, furniture etc. should be
barrier free.”
7.
The list of Practice teaching not
submitted.
8.
The ET Lab, Psychology Lab and
Language Learning Lab are not available.
9.
The seating arrangement in the
Library is not available.
10.
Certified copy of the registered land
documents from competent authority not
submitted.
11.
Approved building plan with Plot No.,
Khata No, Khesra No, Total area, not from
competent civil authority.
12.
Notarized copy of change of land use
certificate issued by the competent
authority not submitted.
13.
Undertaking not submitted in the
prescribed format.
14.
Non-encumbrance Certificate from
Revenue Authority not submitted.
15.
Enclosure regarding column 5 of the
affidavit not submitted.
16.
Building completion certificate with
the Plot number, Khata No., total area &
built up area from competent civil authority
not submitted.
17.
Affidavit of Rs. 100/- and Rs. 10/-
regarding selection committee not submitted
18.
The Consolidated list of teaching
staff not submitted by the institution.
19.
The experience certificate of the
teaching staff not submitted.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
The land is ok, the built up area is less
than norms, the multipurpose hall is less
than norms, issue notice under section 14
(3) (b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for D.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
12 |
11 |
Kabiguru Rabindra Nath College of Education,
Vill/Po- Gosairhat Bandar, City- Mathabhanba,
Dist.- Cooch Behar, West Bengal- 736172, (B.Ed.)
(Private) Code No. ERCAPP306 |
|
13 |
12 |
Kalimpong Govt. PTTI, Vill – Chandralok, PO
– Kalimpong, Dist – Darjeeling, West Bengal
– 734301, (D.Ed.) (Govt.) (West Bengal Board
of Primary Education)
Code No. ERCAPP123 |
|
14 |
13 |
K.S. College of Professional
Education, Vill. – Neora, Danapur, Po. –
Neora, Tehsil/Taluka – Bihta, Town/City –
Danapur, Dist. – Patna, Bihar – 801113, (B.Ed.)
(Private) (Magadh University) Code No.
ERCAPP247 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
As per the building plan submitted, the
institution has stated the Ground Floor Area
as 654.35 sq m, whereas the VT Report states
the Carpet area as 480 sqm.
2.
The size of Multipurpose hall mentioned in
the VT Report i.e. 1925 Sq. ft. is less than
required 2000 sq ft as per Regulations.
Moreover, the size of Multipurpose hall
mentioned in the VTR does not tally with the
size of Multipurpose hall mentioned in the
Building Plan. In the Building plan, the
size of Multipurpose hall is mentioned as
201.87 sqm and 77.77 sqm respectively.
3.
In support of resolution of the approving
authority approving the Building plan, the
VT Members have enclosed a copy of the
resolution passed by the society of the
institution for starting the B.Ed college.
4.
The VT Members have stated that the
institution has not yet obtained the
willingness for practice teaching from the
schools.
5.
As per the VT Report, the furniture in the
library is not yet purchased.
6.
As per VTR, the institution is having only
825 books on teacher education.
7.
As per the VT Report, the playground is not
adequate to conduct football like games.
8.
The VT Members have mentioned that they have
verified the original land document dated
24.09.2009, whereas no such document is
available in the file.
9.
The details of Non Encumbrance Certificate
and Mutation / Land Possession Certificate
not given by the VT Members.
10.
The Building completion certificate
submitted by the institution is issued by a
private Registered engineer, it is
countersigned by Asst Engineer, PWD.
11.
The information regarding seating capacity /
accommodating capacity in the library is
contradictory.
12.
As per the application form, the date of
completion of construction of the building
is 30th April 2009), whereas the
land documents registered on 30th
Sept 2009 submitted does not speak of the
constructed building.
13.
As per the sale deed, the sale is for
homestead land (Farmhouse). The institution
has not submitted Notarized copy of change
of land use certificate issued by the
competent authority. In support of CLU, the
institution had submitted a certificate
issued by the Aanchal Adhikari, which is not
notarized.
14.
The affidavit has been sworn by Kalawati
Singh terming as Secretary, land documents
have been registered through Smt Kalawati
Singh terming as trustee whereas as per the
online application, Dr. Rakesh Singh, Member
is the authorized applicant for the
application form.
15.
The non-encumbrance certificate is issued in
the name of individual.
16.
Approved building plan by the competent
civil authority mentioning the Plot No.,
Total area and Built up area. The signature
of the approving authority does not seem to
be original in light of documents. Further,
the building plan submitted does not contain
the date of approval of the competent
authority.
17.
Enclosure as per column 5 not submitted. In
support of Enclosure 5, the institution had
submitted a certificate issued by the
Aanchal Adhikari on the basis of Affidavit
sworn by Smt Kalawati Singh, terming as
Secretary of the Society.
18.
Building completion certificate with the
plot No., Khata No., total area & built up
area from competent civil authority not
submitted.
19.
Approved building plan is not signed by the
competent authority and covered Area is less
than as per NCTE norms.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
On perusal of V.T. report and C.D. it is
clear that the building is under
construction, notice under Section 14(3)(b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
15 |
14 |
Deo Nagina Welfare and Charitable Trust,
Vill- Makundganj, Po- Babhanway, City-
Hazaribagh, Dist- Hazaribagh, Jharkhand –
825301, (B.Ed.) (Private) (Vinoba Bhave
University) Code No. ERCAPP226 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
Language Learning Lab is not
available as per VT report.
2.
Internet facility is not provided in the ET
lab.
3.
As per VT Report, the size of classrooms are
480 sq. ft as against the requirement of 500
sq. ft as per Regulations.
4.
As per VT Report, the size of multipurpose
hall is 720 Sq. ft. as against requirement
of 2000 sq ft as per Regulations
5.
As per the VT Report, the institution has
provided only 700 books related to
Education.
6.
The VT members have submitted two
contradictory statements with regard to
books. At pg 272 of VT Folder, they have
stated that the institution is having 3137
books, whereas at pg 257 of VT Folder, they
have stated that the institution is having
3050 books.
7.
The infrastructure facilities viz size of
multipurpose hall, classroom, principal
room, library etc. as mentioned in the
Building plan does not tally with the
details of infrastructure details mentioned
by the VT Members, whereas the VT Members
have stated that the infrastructure
mentioned is the same as in the building
plan.
8.
The total area of the Affidavit and land
document not tally with the Building Plan
submitted by the institution.
9.
Notarised CLU not submitted. In support of
Conversion of Land Use Certificate, the
institution had submitted had submitted a
photocopy of Land Use Certificate issued by
Aanchal Adhikari, Hazaribag stating that the
said land is in use of DEO College of
Education, Hazaribagh, Jharkhand.
10.
As per the application form and also the
building completion certificate issued by
Aanchal Adhikari, the building has been
completed in June 2009, whereas the building
plan has been approved by Aanchal Adhikari
on 24.10.2009. Further, in the land
documents registered on 14.10.2009, there is
no mention of the constructed building.
11.
The covered area of the Building plan not as
per NCTE Regulations.
12.
There is no provision for multipurpose hall
in the Building plan submitted by the
institution / society. The institution had
submitted a fresh building plan approved on
3rd May 2010 by the Aanchal
Adhikari wherein the infrastructure details
is different from the infrastructure details
of the earlier building plan. However, the
building plan approved on 3rd May
2010 is not acceptable as the same has been
approved after the last date of submission
of application.
13.
The State Govt recommendation is Negative.
14.
The letter issued by CO dated 16.10.2009
titled Land Use Certificate is actually not
a Land Use Certificate. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
On perusal of CD and VT report, Multi
Purpose Hall is less than NCTE norms, issue
notice under 14(3) (b).
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for B.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written representation within 30
days of issue of the notice.
|
|
16 |
15 |
Ramganj Govt. Primary Teachers’ Training
Institute, Vill – Ramganj, PO – Ramganj,
Dist – Uttar Dinajpur, West Bengal –733207,
(D.Ed.) (Govt.) (West Bengal Board of
Primary Education) Code No. ERCAPP82 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
On the basis of the record, institution file
& VT report, the following deficiencies were
observed by ERC office:
1.
List of teaching staff not submitted
by the institution. Information of only one
Lecturer-in-Charge and one lecturer
submitted in individual prescribed format.
2.
Journals are not available.
3.
Science, Psychology and ET lab not
available.
4.
Language learning lab not available.
5.
NOC of Practice teaching school not
given.
6.
Total built up area less than the
required.
7.
Size of the multipurpose hall is less
than the required.
8.
Size of the classroom not given.
9.
Land is in the name of the Govt. of
West Bengal.
10.
Only six no. of computers are
available.
11.
Seating capacity in the library is
20.
12.
As per VT remarks Governmental apathy
and negligence is behind the closure of the
course.
13.
Certified copy of the registered land
documents from competent authority.
14.
Notarized copy of change of land use
certificate issued by the competent
authority.
15.
Approved building plan with Plot No.,
Khata No, Khesra No, Total area, not from
competent civil authority.
16.
As per application form and affidavit
built up area less than the required.
17.
Enclosure regarding column 5 of the
affidavit not submitted.
18.
Building completion certificate with
the Plot number, Khata No., total area &
built up area from competent civil authority
not submitted.
19.
Non-encumbrance Certificate from
Revenue Authority.
20.
Undertaking not submitted in the
prescribed format. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
Original VT Report, Video CD, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:-
(i)
Built up area is less, issue notice
under Section 14(3)(b)
Hence,
Show Cause Notice u/s 14(3)(b) of NCTE Act be issued to the institution
before refusing recognition for D.Ed. course
on account of deficiencies, observations &
remarks of ERC office. The institution is
to submit written
representation within 30 days of issue of
the notice.
|
|
Sl.
No |
Agenda Item No. |
Contents |
Decision of ERC |
|
17 |
2 |
Krishnapur Primary Teachers’ Training
Institute, Vill & PO – Krishnapur, PS –
Nalhati – 731 237, Birbhum, West Bengal
(Course – PTT), (Private) (Code –
APE00620) (Change of name of the
institution) |
On careful perusal, observation and
consideration of the proposal of the
institution for change of its name along
with the original file, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided that as there is
no provision for change of name of the
institution, under NCTE norms, the case be
refused.
|
|
18 |
3 |
Bagchi Jamshedpur Namita Sankar B.Ed.
College, Vill – Bagchi Jamshedpur, PO –
JhamshedPur, Dist – Nadia, West Bengal –
741122 (B.Ed.) (private) (Code-APE00929)
(Complaint) |
On careful perusal, observation and
consideration of the complaint received
against the institution, along with the
original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
the affiliating university be requested for
comments keeping in view of the complaint
and reply from the institution.
|
|
19 |
6 |
Joyrambati Ramakrishna Sarada Primary
Teacher’s Training Institute, Po- Joyrambati,
Dist- Bankura, West Bengal – 722161, Code
No: APE00618 (Complaint)
|
On careful perusal, observation and
consideration of the complaint received
against the institution, along with the
original file, related clarifications /
guidelines received from the NCTE Hqrs., the
NCTE Act., Rules, Regulations 2009
stipulated by the NCTE, norms and standards,
the ERC decided that comments to be sought
from the affiliating body.
|
|
20 |
7 |
Dr. S. P. M. College of Education, Ghungoor,
Assam University Road, Silchar, Dist–Cachar
Assam – 788014
(Change of premises)
The Committee noted the following
observations of ERC office:
The institution has not submitted the
following required documents as per NCTE
regulation for shifting of premises.
Ř
Application in triplicate
Ř
D.D. of Rs.40,000/- towards re-inspection
fee
Ř
Copy of registered land documents where the
institution is proposed to shift.
Ř
Copy of approved building plan along with
the building completion certificate where
the institution is proposed to be shifted
Ř
The institution is required to submit the
documents as per NCTE norms.
|
On careful perusal, observation and
consideration of the proposal of the
institution for change of its premises along
with the original file, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided that action be
taken by the ERC office in the light of
observation so made. |
|
21 |
9 |
Derozio Primary Teachers Training Institute,
Dist.- Nadia, West Bengal-regarding-By Shri
Ajit Biswas, Vill & Po- Karimpur, Dist.-
Nadia, West Bengal. (APE00609) (D.Ed.)
(Complaint ) |
On careful perusal, observation and
consideration of the complaint received
against the institution, along with the
original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided that
Comments from the concerned institution be
sought. |
|
22 |
11 |
Gangarampur B.Ed. College, Po- Kaldighi, Ps-
Gangarampur, Dist- Dakshin Dinajpur, West
Bengal – 733124, (APE00551) (B.Ed.)
(Complaint) |
On careful perusal, observation and
consideration of the complaint received
against the institution along with the
original file, related clarifications/
guidelines received from the NCTE Hqrs., the
NCTE Act, Rules, Regulations 2009 stipulated
by the NCTE, norms and standards, the ERC
decided that
Comments from the institution and
affiliating body be sought. |
|
23 |
12 |
Pailan College of Management & Technology,
Vill – Kulerdari Gram Panchayat, PO – Joka,
Plot No. 226, City – Kolkata, District –
South 24 Parganas, West Bengal (Course –
B.Ed.) (Private) (University
of Calcutta) Code No.APE00931 (Change of
name of the institution) |
On careful perusal, observation and
consideration of the proposal of the
institution for change of its name along
with the original file, all documents
submitted by the institution, office
observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC noted that reply
awaited from the university as well as from
the institution in this regard. The
Committee decided that this case be
deferred. |
|
24 |
13 |
Complaints received against the following
institutions:
1.
Mohanananda B.Ed. College, Nadia, Burdwan,
West Bengal
2.
Pandua College of Education (B.Ed.), PO –
Pandua, Dist – Hooghly,
West Bengal
3. Tarasankar
Bondopadhyaya B.Ed. College, Ahmedpur, Dist
– Birbhum, West Bengal
|
On careful perusal, observation and
consideration of the complaint received
against these institutions along with the
original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
it is a very serious matter, the complaint
be submitted in the shape of affidavit by
the complainant.
|
|
25 |
14 |
Complaints received against the following
institutions
1.
Mankundu B.Ed. College, Dist – Hooghly, West
Bengal
2.
Reapara PTT College, Dist – Purba Medinipur,
West Bengal
3.
Sri Ramakrishna Sarada Siksha Mandir (B.Ed.
College), Dist – Hooghly, West Bengal
4.
Vidya Sagar PTT Institute, Dist – Purba
Medinipur, West Bengal
5.
Bagnan Teachers Training College, Vill –
Mugakalyan, PO – Bagnan, Dist – Howrah, West
Bengal
6.
Vivekananda PTTI, At-Fakirpur, PO-Dakshin
Dauki, PS-Contai, Dist. Purba Medinipur,
West Bengal
7.
Mousimi Mandal of Vidyasagar PTTI, Dhamalit,
PO – Amdan, PS – Panskura, Dist – Purba
Medinipur, West Bengal
8.
Madhyam Gram Teacher Training College, West
Bengal
9.
Minerva Academy, Nadia, West Bengal
10.
Kaliachak Sultana B.Ed. College, West Bengal
11.
Baliadanga Sarif B.Ed. College, Nadia, West
Bengal |
On careful perusal, observation and
consideration of the complaint received
against these institutions along with the
original files, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC as per
direction of NCTE Hqrs. agreed for
inspection under section 17 at the earliest.
|
|
26 |
15 |
Dr.
Ambedkar Hindi Sanskrit Vidyapeeth,
Begusarai, Bihar – 851127, Code No.
APE00944 (PTT)
(Complaint) |
On careful perusal, observation and
consideration of the complaint received
against the institution along with the
original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
inspection under section 17 be conducted.
1.
|
|
27 |
16 |
Kameshwar Singh Darbhanga Sanskrit
University, PO/Distt Darbhanga, Bihar (Code
No. APE00247) (Shiksha Shastri-B.Ed.) |
Subjudice, hence deferred. |
|
28 |
17 |
Complaints received against the institutions
in the State of Bihar, Jharkhand and Orissa |
|
|
|
|
Decision of the ERC |
|
|
17.1 |
Nalanda Teachers Training College, Nalanda
Complaint received from Sh. Sanjay Kr.
Singh, Advocate, Civil Court Gaya, against
the institution vide letter dated 2nd
June 2010 forwarded by Chairperson-NCTE-HQrs
on 15th June 2010 |
Subjudice |
|
29 |
17.2 |
B.N. Saha DAV Teachers Training College,
Sirsia, Girdih, Jharkhand
Complaint received from Sh. Vijay Kr. Sharma
& Others forwarded by Chairperson-NCTE-HQrs
on 1st July 2010 |
Inspection under section 17
|
|
30 |
17.3 |
Complaint against the self financed colleges
in the State of Jharkhand
Complaint received from Jay Shankar Pandey
vide dated 12th July 2010
forwarded by Chairperson, NCTE-HQrs on 16th
July 2010 |
On careful perusal, observation and
consideration of the complaint received
against the institution along with the
original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
complaint should be given on Affidavit. |
|
31 |
17.4 |
Mithila Teachers Training College, Darbhanga,
Bihar
Complaint received from Mohd. Iqbal Ahmed,
Dharbhanga received in this office on 22nd
June 2010 and 16th July 2010 |
Subjudice |
|
32 |
17.5 |
Harinarain Singh Institute of Teacher
Education, Sasaram, Bihar
Complaint received from Sh. Vijay Prakash,
Advocate received in this office on 16th
July 2010. |
Subjudice |
|
33 |
17.6 |
Complaint received against B.Ed colleges in
Orissa
Complaint received from Sh. Nutan Bharat
through E-mail dated 13th July
2010 against the colleges in Orissa
|
Matter be referred to the Secretary
Education, Government of Orissa. |
|
34 |
17.7 |
Complaint against advocate for ERC in Patna
High Court
Complaint dated 30th June 2010
received from Sh. Manoj Kumar Aasthana on 14th
July 2010 against Sh. S. N. Pathak, Advocate
for NCTE in Patna High Court and also
forwarded by CP-NCTE-HQrs |
Copies of the complaints be sent to Mr.
Pathak endorsing a copy to the NCTE Head
Quarters. |
|
35 |
17.8 |
Complaint against advocate for ERC in Patna
High Court
Complaint dated 3rd August 2010
received in this office on 5th
Aug 2010 from Sh. Anil Kumar, Devchantidi,
Dumaria, Gaya against Sh. S. N. Pathak,
Advocate for NCTE in Patna High Court. |
Copies of the complaints be sent to Mr.
Pathak endorsing a copy to the NCTE Head
Quarters. |
|
36 |
17.9 |
Ursuline Primary Teachers Education College,
Pakur, Jharkhand
Complaint received from Suresh Prasad Singh
& Others against Ursuline Primary Teacher
Education College, Pakur, Jharkhand received
in this office on 21st July 2010
and also forwarded by CP-NCTE-HQrs. |
Notice under Section 17 |
|
37 |
17.10 |
Maharana Pratap B.Ed Mahavidyalaya, Kamaur,
Complaint received from Dr. Satyendra Kr
Tiwari received in this office on 21st
June 2010 against Maharana Pratap B.Ed
Mahavidyalaya, Kaimur/ |
Subjudice, deferred,
action not needed |
|
38 |
17.11 |
Complaint against applications received as
per Regulations 2009
Complaint received from Bihar Educational &
Social Welfare Trust dated 22nd
June 2010 received in this office on 30th
June 2010 against the following institutions |
Subjudice, deferred,
action not needed |
|
39 |
17.12 |
Complaint against Bihar College of
Education, Patna, Bihar (ERCAPP162) |
Subjudice, deferred,
action not needed |
|
40 |
17.13 |
Complaint against Shivam Teachers Training
College, Buxar (ERCAPP300) |
Action not needed |
|
41 |
17.14 |
Complaint against Prakash Punj Teachers
Training College, Jehanabad, Bihar
(ERCAPP321) |
Action not needed |
|
42 |
17.15 |
Complaint against the institutions in Bihar
and Jharkhand
Complaint received from Md. Yasin received
in this office on 20th July 2010
against the inspections made by the Visiting
Team in the State of Jharkhand and Bihar |
Action not needed |
|
43 |
17.16 |
Complaint forwarded by Chairperson-NCTE-HQrs
on 5th July 2010 against Mahesh
Singh Teachers Training College, Gaya |
Action taken |
|
44 |
17.17 |
Complaint against Gyan Ranjan Teachers
Training College, Kindua, Gaya.
No application has been received in ERC in
the name of this institution. |
Action not required. |
|
45 |
17.18 |
Complaint against constituent colleges of
Vinobha Bhave University
Complaint received on 5th August
2010 received through the staff of Vinobha
Bhave University against the seven
constituent colleges of Vinobha Bhave
University. |
Comments from the affiliating University be
sought. |
|
46 |
17.19 |
Complaint against Mahabodhi Mahavidyalaya,
Nalanda
Complaint received in this office on 5th
Aug 2010 from Sh Rameshwar Singh & others
against Mahabodhi Mahavidyalaya, Bihar
Sharif, Nalanda |
Comments on the complaint be sought from the
institution. |
|
47 |
18 |
Complaint received from Old Students
Association, Radhanath Institute of Advanced
Studies in Education, Cuttack, Orissa
against 17 teacher training institutions of
Orissa
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
complaint received against the institution,
related clarifications/ guidelines received
from the NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that
out of 17 institutions, the following two
institutions have submitted reply to ERC and
noted that the said institution are
deficient with regard to staff :-
1.
DAV College of Teacher Education,
Koraput, B.Ed.
2.
Anandapur Anchalik Training College,
Fakirpur, Keonjhar, B.Ed
ERC decided that Notice be given to the
above institutions under section 17 under
intimation to the State Government on the
points noted by the Committee.
1.
Radhanath Institute of Advanced Study in
Education, Cuttack, Orissa-753002 , B.ED.
M.Ed
2.
Dibakar Patnaik Institute of Advanced Study
in Education, Berhampur, Ganjam, Orissa-
760003, B.ED., M.Ed
3.
Dr. Parsuram Mishra Institute of Advanced
Study in Education, Sambalpur,
Orissa-751007, B.ED., M.Ed
4.
Nalini Devi Womens’ College of Teacher
Education, Unit – III, Kharvela Nagar,
Bhubaneswar, Orissa-769010, B.ED., M.Ed
5.
Naba Krushna Choudhury College of Teacher
Education, Angul, Orissa-759122, B.ED., M.Ed
6.
Kabi Samrat Upendra Bhanja College of
Teacher Education, Bhanjanagar, Ganjam,
Orissa – 761126, B.ED.
7.
College of Teacher Education Balangir,
Orissa – 767001, B.ED.
8.
College of Teacher Education, Balasore,
Orissa-756001, B.ED.
9.
Kalahandi Training College, Bhawanipatna,
Kalahandi, Orissa-766001, B.ED.
10.
Rourkela College of Educational Training,
Rourkela, Sundargarh, Orissa-769010, B.ED.
11.
Utkal Mani Gopabandhu B.Ed. College,
Takatpur, Baripada, Mayurbhanj, Orissa – 757
001, B.ED.
12.
Regional Institute of Education, Bhubaneswar,
Sachivalaya Marg, Bhubaneswar, Orissa-751
022, INTEGRATED - 2 YR B.ED, M.Ed (Ele)
13.
Rashtriya Sanskrit Sansthan (Deemed
University),Sri Sadashiva Campus, Puri,
Orissa – 752001, SHIKSHA SHASTRI, (B.ED.)
14.
Hindi Teacher’s Training Institute, Block
No.-29, Old Secretariate, Dist.-Cuttack,
Orissa-753001, B.H.ED.
15.
Government Teacher’s Training
College, Phulbani, Vill/PO-Phulbani, Plot
No.– 397,184,380,156, Dist- Kandhamal,
Orissa-762001 , B.Ed.
Further, the ERC also decided that Show
Cause Notice u/s 17 of the NCTE Act be
issued on the above 15 institutions on
account of non submission of
comments on the complaint forwarded
by ERC office as per the decision of ERC in
105th Meeting.
|
|
|
48 |
19 |
Continuance of Distance Education Programme
in CT course for untrained Elementary School
Teachers of the State of Orissa
(OR-E-2/2002) |
On careful perusal, observation and
consideration of the proposal from the State
Govt along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided as follows:
(i)
The ERC agreed with the request of
the State Govt. of Orissa, recommended to
the Chairperson, NCTE for approval.
|
|
49 |
20 |
Hindi Teachers Training Institute, Cuttack,
Orissa, (OR-S/N-1/2005) APE00029 (B.H.Ed.-Secondary
Teacher Education) (Complaint) |
On careful perusal, observation and
consideration of the complaint received
against the institution along with the
original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
Notice be issued under Section 17, under
intimation to the State Government. |
|
50 |
21 |
E-mail dated 05.07.2010 received from Ms.
(Dr.) Uma Pan, Principal, Santiniketan
Boniad B.Ed. Training Institute, Burdwan,
West Bengal regarding information about her
resignation from the post of Principal of
the institution (Code No. APE00575) |
On careful perusal, observation and
consideration of email received along with
the original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided that Notice be
issued to the institution for the status of
the Principal. |
|
51 |
22 |
Jiaganj Institute of Education & Training,
Vill- Jiaganj, Po- Jiaganj, Dist-
Murshidabad, West Bengal – 742123 (B.Ed.)
(Private) (Kalyani University) Code
No.APE00955 |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided that the
institution be permitted to continue under
intimation to the affiliating university. |
|
52 |
23 |
Chaitanya College of Education,
Vill-Singhati, PO-Ghateswar, Dhubulia, West
Bengal – 741154 (B.Ed.) (Kalyani University)
(Code No.APE01009) |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided that the
institution be permitted to continue under
intimation to the affiliating university. |
|
53 |
24 |
Holy Child B.Ed. College, Vill – Noonbahi
Road, Holy Child Campus, PO – Malda Head
Post Office, Dist – Malda, West Bengal – 732
101 (B.Ed.) (University of North Bengal)
(Code No.APE00865) (Complaint)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
The ERC office made the following
observations on the basis of reply submitted
by institution in response to Notice issued
u/s 17:
1.
As per land possession certificate
the land is processed by Dr. Debasish Sarkar
who is Secretary of the institution.
2.
List of teaching staff not submitted.
3.
Facilities for Language Learning Lab are not
mentioned in the VT report.
4.
The institution has not submitted the
Affidavit on Rs.10/- stamp paper regarding
individual teaching staff along with
Principal.
5.
Experience certificate of the
Principal namely Shri Sadhan Kumar Thakur
not submitted.
6.
As per VTR the Society registered on
13.07.2009 and application received on 2007.
7.
The VTR has provided only the detail
of one FDR for each of EF & RF whereas the
institution is recognized for D.Ed. & B.Ed.
Course.
8.
Teacher for Primary Education not
appointed by the institution. Faculty list
approved by the affiliating University not
submitted.
9.
3 classrooms has been provided by the
institution.
10.
The plot no. mentioned in the
affidavit are not same as in the land
document. Further, khesra No. mentioned in
the affidavit are not therein the schedule
of the land of the VTR and of the affidavit)
|
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided as follows:
(i)
Issue order under section 17
(withdrawal order) as the land is in the
name of individual.
(ii)
The institution is not functioning as
per NCTE norms and the salary and service
conditions of teaching and non-teaching
staff are also not as per NCTE norms.
Hence,
order of withdrawal of recognition for B.Ed.
course u/s 17 of NCTE Act
be issued to the institution on account of
deficiencies, observations & remarks of ERC
office.
|
|
54 |
25 |
Dept. of Education, Rajiv Gandhi University,
Vill- Rono Hills, Po- Doimukh, City-
Itanagar, Dist- Papumpare, Arunachal Pradesh
– 791112 (B.Ed.) (Rajiv Gandhi University)
(Code No: APE01201)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
The ERC office made the following
observations that six months have already
lapsed and the institution has still not
complied the following deficiencies as per
the permission order dated 28.07.2010 and
the institution is still deficient with the
following:
1.
One Set of application in prescribed format
not submitted.
2.
D.D. of Rs. 40,000/- towards Processing Fee
not submitted.
3.
An Affidavit not submitted (in original)
duly attested by the Notary Public/ Oath
Commissioner in prescribed format. As per
clause 8(8) of the NCTE Regulations, an
affidavit on Rs. 100 stamp paper attested by
Notary Public/Oath Commissioner in the
prescribed format is to be submitted
indicating location of the land, total area
in possession, permission of competent
authority to use for educational purpose,
mode of possession etc
4.
Fixed Deposit Receipt of Rs. 5.00 lakhs (in
original) not submitted as Endowment Fund.
As per clause 10(1) of the NCTE Regulations,
in case of self-financed
institutions/courses, Fixed Deposit Receipt
of Rs. five lakhs towards Endowment Fund (in
original), from a Nationalized Bank of a
duration of & above 5 years is required. OR
Certificate/ Supporting documents from the
Government that the course is not self
financed and that it is fully funded by the
Government.
5.
Fixed Deposit Receipt of Rs. 3.00 lakhs (in
original) not submitted as Reserve Fund. As
per clause 10(1) of the NCTE Regulations, in
case of self-financed institutions/courses,
Fixed Deposit Receipt of Rs. three lakhs
towards Reserve Fund (in original), from a
Nationalized Bank of a duration of & above 5
years is required. OR Certificate/
supporting documents from the Government
that the course is not self financed and
that it is fully funded by the Government.
6.
Approved Building Plan from competent
authority with plot no. Khata No. Built up
area, Total area, Khesra no. etc to be
submitted for the proposed B.Ed. course. As
stipulated in the instructions enclosed with
the application proforma prescribed under
clause 5(1) of the NCTE (Recognition Norms &
Procedure) Regulations, 2007 approved
building plan along with completion
certificate (if the building has already
been constructed) from the concerned
competent authority is required to be
submitted.
7.
Certified copy of Registered land lease
/ownership documents has not been submitted
as per Regulation 8(8) & 8(7). ( Duly
notarized English version of land documents
also to be submitted)
8.
Building completion certificate from the
competent authority mentioning the plot no.
Khata No. Built up area, Total area, Khesra
no. etc to be submitted for the proposed
D.Ed. course (if the building has already
been constructed) from the concerned
competent authority is required to be
submitted. As per NCTE Hqrs. , New Delhi
vide letter dt. 28.06.2009 (Pg. 35),
received in this office on 07.07.2009 the
application is processed for the academic
session 2009-2010. |
On careful perusal, observation of office &
remarks along with the original file,
related clarifications/ guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
the Registrar of the Rajiv Gandhi University
be informed to submit the compliance within
30 days.
|
|
55 |
26 |
Vivekananda Primary Teacher’s Training
Institute, Vill- Dhukrijhara, PO- Sadhurhat,
Dist- South 24 Parganas, West Bengal –
743504 (D.Ed.) (West Bengal Board of Primary
Education) Code No.APE01087
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
Notice u/s 14(3)(b) was issued on 02.07.2010
with the following deficiencies:
(i)
Facilities of Language Learning Lab are not
mentioned in the VT Report.
(ii)
No proper playground available as per VT
remark.
(iii)
The institution has not submitted the
Affidavit on Rs.100/- stamp paper regarding
selection committee for recruitment of the
teaching staff.
(iv)
The institution has not submitted the
Affidavit on Rs.10/- stamp paper regarding
individual teaching staff.
(v)
Experience certificate of the Principal is
not submitted.
(vi)
The staff are required to be appointed after
issue of LOI for recognition as per NCTE
Regulation 2009.
(vii)
Land document registration not submitted to
the VT.
(viii)
Books in Library are less than requirement.
As per VT land is in Two plots. Land is
opposite to road side.
(ix)
Infrastructure as per (VT) is less than
required i.e. Multipurpose hall etc.
Documents of Library, Psychology, Science
etc. |
On careful perusal, observation and
consideration of reply in response to notice
u/s 14(3(b) along with the original file,
related clarifications/guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows:
Issue refusal order under Section 14
on
- Registration of the land not on
due date
- The size of the Multi Purpose
Hall is less which is admitted fact vide
Secretary letter 26.07.2010 and other as
figures in our notice under Section
14(3)(b).
Hence,
order of refusal of recognition for D.Ed.
course u/s 14 (3)(b) of NCTE Act
be issued to the institution on account of
deficiencies.
|
|
56 |
ER-112.9. 27 |
Sarif B.Ed. College, Baigachhipara, Golam
Rahaman Lane College Campus, Santipur, Dist-
Nadia, West Bengal – 741404 (Code No.
APE01156)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
As per the documents submitted by the
institution in response to Notice u/s 17,
the following observation was made by ERC
office:
Ř
The name of the Principal appointed by the
institution is not available as per the List
of O.E.S. submitted who will retire from the
govt. service on attaining the age of
superannuation.
Ř
The land documents submitted by the
institution is not certified by the
competent authority.
Ř
The land use certificate issued by the Gram
Panchayat cannot be accepted. It must issued
from the competent authority.
Ř
The land is located in more than one plot.
Ř
Affidavit of Rs. 100/- is submitted not in
prescribed format.
Ř
VT report is not satisfactory
Ř
The institution has requested for change of
Premise after inspection u/s 17, It seems
that the institution was in defaulting
running teacher training programme. |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC decided as follows:
Issue withdrawal order under section 17
indicating the deficiencies pointed out by
the office and VT team. The requisite fee
may be returned.
Hence,
order of withdrawal of recognition for B.Ed.
course u/s 17 of NCTE Act
be issued to the institution on account of
deficiencies, observations & remarks of ERC
office.
|
|
57.
|
ER-112.9. 28 |
Sagardighi Teachers Training College, Vill/Po.-
Morigram, Dist.- Murshidabad, West Bengal-
742 237, Code No.APE01146 |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from
the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC observed
that complaints
received from the Secretary. ERC decided
that the institution be allowed to continue. |
|
58.
|
ER-112.9. 29 |
Vivekananda College of Education Main Road,
Karimganj, Dist- Karimganj, Assam – 788710,
Code No. APE0327 |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC
decided that the institution be allowed to
continue on perusal of reply and VT report
considering it an old case. |
|
59.
|
ER-112.9. 30 |
Education College, Vill- Basantapur, Po-
Basantapur, Dist- Murshidabad, West Bengal –
742406, Code No. APE01093 |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC
decided that after seeing reply of all the
relevant documents, the institute be allowed
to continue the courses.
|
|
60.
|
ER-111.9.
31 |
D.M. College of Teacher Education, Dist-
Imphal, Manipur – 795001 (Course – B.Ed &
M.Ed.)(Govt.)(Code- APE00169) |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC
observed the following:
Letter from the Principal’s office
is not satisfactory. ERC decided that the
College be directed to submit the list of
teaching staff separately for B.Ed. and
M.Ed. courses duly countersigned by the
competent authority of the affiliating
University with supporting documents of
appointment in the college within one month
from the date of issue of this office
letter. |
|
61.
|
ER-112.9. 32 |
Baihata Chariali B.Ed. College, Po – Baihata
Chariali, Dist. – Kamrup, Assam – 781381
(Code No. APE00034) (Change of premises)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
As per the documents submitted by the
institution in response to Notice u/s 17,
the following observation was made by ERC
office:
As per Notice u/s 17(1) the institution has
not submitted the following documents:
1.
Requisite no. of teachers are not qualified
as per NCTE Norms.
2.
Full time & part time teachers are
appointed.
3.
Full time staff needs to be paid Dearness
Allowance in addition to the basic salary in
which the college not paying now.
4.
The Library and the IC Laboratory need to
the improved.
5.
Physical Education lab is non-existent and
needs to be established.
6.
In adequate computers.
7.
Language learning lab not available.
8.
List of teaching staff not in prescribed
format.
9.
The built up area consist 5 buildings the
located distance of 5 building is not clear.
10.
The staff list is required to be appointed
by the Affiliating University.
11.
3 staff have been appointed after
promulgation of NCTE Regulation 2009 and
the same are not qualified.
12.
The land are also not as per NCTE
Regulations.
|
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC
decided as follows:
List of Teaching Staff submitted not in
shape, approval of the competent authority
(Affiliating University) within 30 days,
accordingly the institution be advised for
compliance.
|
|
62.
|
ER-112.9.
33 |
Patharkandi College of Education, PO –
Patharkandi, Dist – Karimganj, Assam –
788724 (F. No. : AS-S/E-18/97) (New Code :
APE00371)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
As per the documents submitted by the
institution in response to Notice u/s 17,
the following observation was made by ERC
office:
1.
The land documents is in the name of the
Manik Hussain Talukdar, Principal,
Ptharkandi College of Education. Which is
not acceptable as per NCTE norms.
2.
The institution has submitted the Affidavit
on Rs.20/- stamp paper regarding teaching
staff which is not in prescribed format.
3.
The institution submitted list of teaching
staff which is not clear.
4.
In the list the institution submitted 1+8
lecturers in which 2 lecturers are paid in
consolidated pay.
5.
Requisite no. of teaching staff not
qualified as per NCTE Norms
6.
As per essential data sheet the total built
up area is 4900 sq. ft.
7.
Multipurpose hall is 1000 sq. ft.
8.
The premises of use of land are for
educational purpose has not been submitted
by the VT.
9.
As per the land document submitted by the
land is in the name of Principal of the
institution.
10.The
sitting capacity in the library is less.
11.The
institution is required to submit staff list
duly appointed by the affiliating
University.
|
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC
decided to seek clarification on point 1, 6,
8 & 9. |
|
63.
|
ER-112.9.
34 |
Chandrakanta Hazarika College, Amolapatty,
Po/Dist. – Dibrugarh, Assam – 786001, Code
No. APE00388
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
As per the documents submitted by the
institution in response to Notice u/s 17,
the following observation was made by ERC
office:
As per Notice u/s 17(1) the institution has
not submitted the following documents:
1.
Physical Education, Art, Work Experience, IT
Literacy teachers not available.
2.
Hall is not available.
3.
Games & sports facility not available.
4.
Psychology lab & educational technology lab
not available.
5.
Facilities for language learning not
available.
6.
Library resources less than the required.
7.
Physical Education resources not available.
8.
The College is managed by Governing body
which is not registered.
9.
The College is functioning for the last
eight years 2002-2010 without recognition of
NCTE.
10.
The infrastructural &instructional
facilities are totally deficient to run the
B.Ed. Course.
11.
As per VT remarks the institution violation
of NCTE Regulation.
12.
It is deficient for every aspect.
13.
As per affidavit Built up area less than the
required.
14.
Approved Building plan & building completion
certificate not given.
15.
Requisite no. of teaching staff not
qualified.
16.
List of teaching staff not in prescribed
format.
17.
The building is in a congested residential
area and less as a college building. It is
in adequate for 60 student & staff.”
18.
As per VT, facilities for Library, Teaching
Learning Resource Centre for Science &
Mathematics, Psychology resources centre and
ICT facilities, Centre for Art & work
experience do not exist.
19.
Copy of land use certificate not available.
20.
Approved per building plan not available.
21.
The building completion certificate not
available.
22.
As per Essential data sheet, the total built
up area is 4320 Sq. ft.
However the institution submitted a
representation dtd. 26.07.2010. Committee
may see. No supporting documents not
submitted. |
On careful perusal, observation and
consideration of reply in response to notice
u/s 17 along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act, Rules, Regulations
2009 stipulated by the NCTE, norms and
standards, the ERC
decided as follows:
As per adverse VT report and available
papers, the Committee recommends for
withdrawn of recognition of the college.
Hence,
order of withdrawal of recognition for B.Ed.
course u/s 17 of NCTE Act
be issued to the institution on account of
deficiencies, observations & remarks of ERC
office.
|
|
|
Agenda Item ER-112.7.4 Appeal Cases
under process on being remanded
back by the Appeal Committee.
|
|
64.
|
ER-112.4.1 |
Al- Iqra Teacher’s Training College, Vill-
Bario, Po- Sarkardih, Dist- Dhanbad,
Jharkhand – 828109 Code No. ERCAPP215
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
65.
|
ER-112.4.2 |
Lala Pritam B.Ed. College, Vill- Kishunur,
Po- Chatra, Dist- Chatra, Jharkhand – 825401
Code No. ERCAPP286
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
66.
|
ER-112.4.3 |
Manrakhan Mahato B.Ed. College, Vill- Kedal
Bit More Mesra, Po- Neori Vikas, Tehsil –
Kanke Block, Dist- Ranchi, Jharkhand –
825217 Code No. APE0175
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
67.
|
ER-112.4.4 |
Chanakya Teacher’s Training College, 506,
Sapaha / Madhupur, Madhupur, Deogarh,
Jharkhand – 815353 (Code No. ERCAPP110
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
68.
|
ER-112.4.5 |
Jhargram Bani Bhavan Elementary Teacher
Education Programme Vill- Old Jhargram, PO-
Old Jhargram, Dist- Midnapore, West Bengal –
721507 (Code No.APE01100)
As per the decision of Appeal Committee vide
order No. 89-1085/2009-Appeal/A 14969 dated
5.5.2010, the case of the institution has
been remanded back to ERC for necessary
action.
|
VT be constituted the detail of deficiencies
be informed to the V.T. members.
The following VT members be deputed for
conducting inspection of the institution:
1.
Dr. Sarat Kumar Rout, Cuttack, Orissa
2.
Dr. R.P. Vadhera, Aizawl, Mizoram
|
|
69.
|
ER-112.4.6 |
Alokekendra Samabay Primary Teachers
Training Institute, Po- Alokekendra, Ps-
Debra, Dist.- Paschim Medinipur, West
Bengal- 721156, (Code No. APE00630)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
70.
|
ER-112.4.7 |
Rehman College of Education, Vill-Taldanga
Masjid Road, PO- Chirkunda, Tehsil-
Chirkunda, Dist- Dhanbad, Jharkhand- 828202,
(Code No. APE01174) |
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
71.
|
ER-112.4.8 |
David Hare Teachers Training College, Malda,
Vill- Mahanagar, 20, Mile Cheque Post, Po-
Katna, Dist – Malda, West Bengal – 732124
(Code No. ERCAPP57)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
This institution was refused recognition by
ERC in its 107th meeting held on
5th –8th May 2010 on
the following grounds: -
i.
Notarized CLU not submitted.
ii.
Undertaking in prescribed format not
submitted.
iii.
Building plan submitted is not approved by
the Competent Civil authority.
iv.
The Built up area mentioned in the building
plan and building completion certificate do
not tally.
v.
A certificate from the registering authority
clearly indicating the provisions of act/
law under which the trust has been
registered.
vi.
FDR not in the name of the
institution.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-579/2010-Appeal/A23455 dated 27.08.2010
has been remanded back to ERC. Accordingly,
the appeal was accepted and ERC’s order
dated 15.05.2010 set-aside with direction to
the ERC for further processing of the case
on merit.
Further, on scrutiny of
application, the following observations are
submitted:
(i)
As per appeal order “ the committee noted
that the institution submitted notarized
copy of CLU dt.16.07.2009”. However, as per
record available in the file Pg.175, the
certificate dt.16.07.2009 has been issued by
the Pradhan stating that” schedule of land
is exclusively meant for running the David
Hare Teachers Training College”. Moreover it
is not notarized.
(ii)
Undertaking in the prescribed format is also
on record.
(iii)
The institution has not submitted CLU from
the competent authority.
(iv)
As per the building plan, the multipurpose
hall is less than the required norms.
(v)
As per the appeal order dated 27.08.2010,
the institution has a copy of CLU (not
notarized) along with a notarized affidavit
on judicial stamp paper of Rs.20/- regarding
conversion of land.
(vi)
As per the records available in the file,
CLU is not available.
|
On careful perusal, observation and
consideration of order of the Appellate
authority along with the original file,
related clarifications/guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC
decided to issue notice as per direction of
the Appeal Committee |
|
72.
|
ER-112.4.9 |
Saraswati Devi Institute of B.Ed., Vill-
Ghanashyampur, Po- Purandarpur, City- Kandi,
Dist.- Murshidabad, West Bengal- 742171,
(Code No. ERCAPP236)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
This institution was refused recognition by
ERC in its 107th meeting held on
5th –8th May 2010 on
the following grounds: -
1.
Building plan not approved by the
appropriate civil authority.
2.
Building Completion Certificate with
the plot No., khata No., total area & built
up area from Competent Civil Authority.
3.
Total area and built up area not
mentioned in the building plan and plinth
area mentioned in the plan which is less as
per NCTE norms.
4.
Certificate of Registration of
Society/ trust (or a certificate/letter from
the Registering authority clearly indicating
provisions of act/law under which the trust
has been registered) not submitted.
5.
Notarized CLU issued by the competent
authority not submitted.
6.
The affidavit mentioning the date of
registration of land documents has been
sworn on 02nd Feb 2010 i.e. after
the last date of submission of application.
7.
The Permission No and date as per
Enclosure 5 not mentioned in the Affidavit.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-558/2010-Appeal/A23407 dated 27.08.2010
has been remanded back the case to ERC for
conducting an inspection and for further
action thereafter.
Further, on scrutiny of application, the
following observations are submitted:
(i)
The ERC may take note of its refusal order
and the order of the Appellate Authority.
Affidavit is incomplete in respect of Col-5.
(ii)
The notarized CLU issued by the Gram
Panchayat without bearing Mmo etc. is
dtd.11.02.2010 and notarized on 08.02.2010
is not only contradictory but also after the
date of submission of application which is
not acceptable.
(iii)
The building plan signed by the
Pradhan has been accepted but it is not
signed by the Engineer. |
VT be constituted the detail of deficiencies
be informed to the V.T. members.
|
|
73.
|
ER-112.4.
10 |
Durgapur B.Ed. College, Vill – Durgapur, PO
– Bidhannagar, Dist – Bardhaman, West Bengal
– 713 212, Code No. ERCAPP256
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
(i)
The plot no., total area, built up area not
mentioned in the Building completion
certificate.
(ii)
Covered area/ plinth area not mentioned in
the building plan
(iii)
The affidavit complete in all respects has
been sworn on 11.02.2010 i.e. after the last
date of submission of application.
(iv)
The Notarized CLU has been issued on 9th
Feb 2010 i.e. after the last date of
submission of application.
(v)
As per the document, the land is not
exclusive for B.Ed College. It is also
being used for MBA, MCA, Hotel Management
etc.
(vi)
As per affidavit the plot no. is A-201
however in the building completion
certificate it is mentioned that building is
constructed on plot no. 215(P) and as per
building plan the plan is for A-201 &
215(P). in the application the plot no. is
A-201.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-559/2010-Appeal/A23387 dated 27.08.2010
has been remanded back the case to ERC for
conducting a inspection of the institution
and further action thereafter as per
regulations.
Further, on scrutiny of application the
following observations are submitted :
(i)
CLU dt. 28.04.2009 appears to be NCTE
and the document submitted by land use
certificate in support of CLU is 09.02.2010.
|
VT be constituted the detail of deficiencies
be informed to the V.T. members.
1.
|
|
74.
|
ER-112.4.
15 |
Suniti Educational Trust, Vill – Kalyani, PO
– Kalyani, City – Kalyani, Dist – Nadia,
West Bengal – 741 235 Code No. ERCAPP125
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
The recognition of B.Ed. course of
institution was refused on the following
grounds:
1.
Two more sets of downloaded
applications with supporting documents.
2.
Notarized copy of Change of Land Use
Certificate issued by the competent
authority
3.
The land documents submitted
indicates that the land is not in a single
plot.
4.
Non encumbrance certificate from Revenue
Authority
5.
Building completion certificate does not
show the plot no., khata no., total area &
built up area from competent civil authority
6.
Certificate of Registration of Society/
trust (or a certificate from the Registering
Authority clearly indicating provisions of
act/ law under which the trust has been
registered.)
7.
Copy of Approved building plan by the
competent civil authority mentioning the
plot number, Khatian No., total area, built
up area & covered area/ plinth area etc.
8.
As per application the institution
has stated that it is not running any other
course whereas as per land documents /
submitted, the land is allotted for
homeopathic Medical College and Hospital,
which needs to be clarify.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-616/2010-Appeal/A23713 dated 27.08.2010
has been remanded back the case to ERC for
re-issuing the deficiency letter and for
further action thereafter.
|
On careful perusal, observation and
consideration of order of the Appellate
authority along with the original file,
related clarifications/guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC
decided to issue Notice for compliance of
deficiencies within 30 days |
|
75.
|
ER-112.4.
16 |
Uday Memorial B.Ed. College, Vill- Kedal,
Po- Neori Vikas, Dist- Ranchi, Jharkhand –
835217, Code No. ERCAPP191
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
This institution was refused recognition by
ERC in its 107th meeting held on
5th –8th May 2010 on
the following grounds: -
1.
Notarized copy of Change of Land Use
Certificate issue by the competent authority
(Not submitted).
2.
The institution has mentioned two different
information in the affidavit dated 26th
Oct 09 and the Affidavit dated 16th
Feb 2010 with regard to Enclosure as per
column 5 of the Affidavit. The enclosure 5
of the Affidavit dated 26th Oct
09 has not been submitted whereas in support
of Enclosure 5 of the Affidavit dated 16th
Feb 10, the institution had submitted a
declaration of the society for exclusive use
of land by the society issued on 11th
Nov 2008.
3.
The land documents are in the name of
individual. The land documents are in the
name of Uday Memorial B.Ed college, Kedal,
Thana Sadar, Distt Ranchi Director Sh.
Santhosh Mahto whereas it should be Uday
Memorial B.Ed College, Kedal, Thana Sadar,
Distt Ranchi through Director, Sh. Santhosh
Mahto. As per the sale deed dated 20th
October 2008, the land is agricultural .
The institution has not submitted any
document to show that it has got the land
converted from agricultural to educational /
institutional.
4.
The Plinth area in the building is 800 sqm
whereas as per Regulations 1500 sqm is
required on the Ground floor only. The
NCTE-HQrs vide letter No. F.No.
48-34/2010/NCTE/N&S/A13303 dated 9th
April 2010 had clarified that required
built-up-area as prescribed in the concerned
norms in the Regulations 2009 refers to the
total built up area available in a single
storey or multi-storey building constructed
upon the prescribed land area.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-556/2010-Appeal/A23741 dated 31.08.2010
has been remanded back the case to ERC for
further processing of the case on merit.
On Scrutiny of the application submitted by
the institution, the following observations
are noted :-
1.
The CLU has not been submitted to the
office of ERC till date. However, on perusal
of the appeal filed by the institution and
copy received from NCTE-HQrs, it is observed
that the institution had submitted a copy of
Certificate issued by the Aanchal Adhikari
stating that the office has no objection for
using the land for educational purposes.
Moreover, the same is not notarized.
Annexure 3 of Appeal file.
2.
In support of the Enclosure 5 of the
Affidavit i.e. the permission of the
authority to use the institution had
submitted the copy of resolution of the
society (Pg 106).
3.
As per the sale deed dated 20th
Oct 2008, the land is agricultural. As per
the Appeal file, the institution had
submitted a certificate issued by the
Aanchal Adhikari stating that the office has
no objection for using the land for
educational purposes but no document has
been submitted to show that the land has
been converted from Agricultural to
Educational.
4.
The land documents are in the name of
individual. The land documents are in the
name of Uday Memorial B.Ed college, Kedal,
Thana Sadar, Distt Ranchi Director Sh.
Santhosh Mahto whereas it should be Uday
Memorial B.Ed College, Kedal, Thana Sadar,
Distt Ranchi through Director, Sh. Santhosh
Mahto. As per the sale deed dated 20th
October 2008, the land is agricultural .
The institution has not submitted any
document to show that it has got the land
converted from agricultural to educational /
institutional.
|
On careful perusal, observation and
consideration of order of the Appellate
authority along with the original file,
related clarifications/guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC
decided to issue Notice as demanded by the
appeal committee. |
|
76.
|
ER-112.4.
17 |
Katihar Teachers Training College,
Vill-Sirsa, Po-Dalan, Dist.- Katihar, Bihar
– 854105, Code No. ERCAPP296
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
This institution was refused recognition by
ERC in its 107th meeting held on
5th –8th May 2010 on
the following grounds: -
1.
FDR not in the name of the institution.
2.
In the application form, the website address
and PAN No of the Society is not mentioned.
3.
As per the Gift Deed registered on 26th
October 2009, the gifted land is a
residential vacant land.
4.
Notarized copy of Conversion / Change of
Land Use Certificate from the competent
authority not submitted. In support of
Change of Land Use & Enclosure 5 of the
Affidavit, the institution had submitted a
Memo dated 29th October 2009
issued by the Circle officer stating that
the land can be used for educational
purposes and notarized on 19th
Jan 2010 which is after the date of
application.
5.
The building plan has been approved by the
Sarpanch of the village on 20th
Jan 2010 i.e. after the last date of
submission of application..
6.
Non encumbrance Certificate issued on
14.01.2010 after the date of submission of
application.
7.
The duly filled in Affidavit complete in all
respects has been sworn on 4th
Feb 2010 i.e. after the last date of
submission of application.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-566/2010-Appeal/ A23745 dated 31.08.2010
has been remanded back the case to ERC for
further processing on merit.
On Scrutiny of the application submitted by
the institution, the following observations
are noted :-
1.
The document purported to be CLU submitted
by the institution and accepted by the
Appellate Authority has been notarized on 19th
Jan 2010, which is not acceptable as per
NCTE Regulations and also clarification
issued by NCTE-HQrs vide letter dated 2nd
December 2009.
2.
The duly approved building plan has been
submitted by the institution on 20th
Jan 2010. In the appeal, the institution
has stated that it has got the drawing
approved by the Sarpanch on 26th
Oct 09 and also submitted the drawing
alongwith the Appeal (Pg 34 of Appeal
file). The same is a tampered with
reference to another document at pg 35 in
the appeal file.
3.
In the Affidavit dated 29th Oct
2009 the institution has not mentioned the
details about enclosure 5 of the Affidavit,
whereas in the another affidavit sworn on 4th
Feb 2010 the details have been filled in.
Hence, the affidavit sworn on 29th
Oct 09 is incomplete and not acceptable and
the another complete affidavit has been
sworn on 4th Feb 2010 i.e. after
the last date of submission of application,
hence not acceptable.
4.
The non-encumbrance certificate has been
issued in the name of Individual. No
mutation/land possession certificate has
been submitted.
5.
The document in support of CLU at pg 189 of
file & 32 of Memorandum of Appeal is
notarized on 19th Jan 2010.
Hence, notarized CLU as per 7 (1-A) was not
ready at the time of submission of
application.
6.
Building plan submitted in Memorandum of
Appeal is tampered (Pg 34 & 35).
|
On careful perusal, observation and
consideration of order of the Appellate
authority along with the original file,
related clarifications/guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC
decided to issue Notice as demanded by the
appeal Committee. |
|
77. |
ER-112.4.
18 |
J R A Teachers Training College, , Vill.-
keshopur, Po- Balukaram, Dist.- Vaishali,
Bihar- 844113, Code No. ERCAPP164
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
This institution was refused recognition by
ERC in its 107th meeting held on
5th –8th May 2010 on
the following grounds: -
1.
FDR not in the name of the
institution.
2.
The institution had sworn the
Affidavit on 26th October 2009
wherein the date of permission of the
competent authority for running education
institution as per Encl 5 of the affidavit
has been mentioned as 27.10.2009; hence, the
said Affidavit is not acceptable.
3.
As per the Land Title Certificate,
application form building completion
certificate, the institution has earmarked
only 797.42 sqm of built up area for the
proposed teacher education course, which is
less than required as per NCTE norms.
4.
Notarized CLU not submitted. In
support of Land Use Certificate, the
institution had submitted a Land Use
Certificate issued by the Aanchal Adhikari
on 9th Feb 2010 stating that the
land was agricultural but now the land will
be fully used for the teacher training
college, which is not notarized.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-602/2010-Appeal/ A23531 dated 27.08.2010
has been remanded back the case to ERC for
further processing on merit.
On Scrutiny of the application submitted by
the institution, the following observations
are noted :-
1.
The Affidavit sworn by the
institution on 26th Oct 09 makes
a mention of the permission of the competent
authority as per Encl 5 of affidavit as 27th
Oct 09. The said affidavit is not
acceptable as to how can the deponent sworn
the affidavit prior to the issue of approval
letter and also state that the said document
is enclosed with the Affidavit. The
Appellate authority has remanded the case
back to ERC on the ground that the said
ground was not reflected in the Deficiency
Letter. As per NCTE-HQrs letter dated 2nd
Dec 09, the deficiency letter was to be
issued only for the missing documents. The
Committee may please see.
2.
The document purported to be CLU
submitted by the institution has been
notarized on 19th Feb 2010 i.e.
after the date of submission of
application. The same cannot be accepted as
the Appellate Authority vide its various
orders had not accepted any document which
has been issued / notarized after the last
date of submission of application. The
same can also be verified by the Order No.
F.No.89-636/2010-Appeal dated 15th
Seb 2010 & F.No. 89-607/2010-Appeal dated 27th
Aug 2010 placed in the file.
|
On careful perusal, observation and
consideration of order of the Appellate
authority along with the original file,
related clarifications/guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC
decided to issue Notice for compliance. |
|
|
|
Agenda Item ER-112.9(i)
Deferred Cases
|
|
78. |
ER-112.9(i).1 |
Complaint received from Bihar Teacher
Training College Association vide fax dated
26th May 2010 addressed to
Chairperson, NCTE requesting for natural
justice to all B.Ed. colleges in Bihar and
information regarding report submitted by
M.S. |
Sub-Judice |
|
|
Agenda Item ER-112.7.4 Appeal Cases
under process on being remanded
back by the Appeal Committee.
|
|
79. |
ER-112.4.1 |
Mankundu B.Ed. College, PO.- Mankundu,
Dist.- Hooghly, West Bengal- 712 139 (B.Ed)
(Private) Burdwan University (Code No. Code
No.APE01188) |
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
This institution was refused recognition by
ERC in its 106th meeting held on
20th –22nd April 2010
on the following grounds: -
1.
The Principal Shanti Sarkar has
produced two certificates of two station of
the same time period which is not
acceptable.
The institution preferred an Appeal and the
Appellate Authority vide order No.
89-749/2010-Appeal dated 15.09.2010 has been
reversed the case to ERC with a direction to
the ERC to grant formal recognition to the
institution immediately. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
order of the Appellate Authority, all
documents submitted by the institution,
related clarifications/guidelines received
from the NCTE Hqr, NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC Committee noted
that the Appellate authority had reversed
the case on the plea that the principal with
requisite qualification and experience is
appointed, whereas there is no such document
received so far as such the institution be
asked to submit the status of the principal
with the approval from the Affiliating
University (competent authority). |
|
80. |
ER-112.4.2 |
Kiran Teachers Training College, Vill-
Sagarpur, Po- Sagarpur, Dist.- Madhubani,
Bihar- 847239 (Private) (B.Ed) (L.N.Mithila
University) |
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
81. |
ER-112.4.3 |
Dr. S. Radhakrishanan College of Education,
Vill/Po- Chiksia, Tehsil – Chas, Dist-
Bokaro, Jharkhand – 827013 (Private) (B.Ed)
(Vinoba Bhave University)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
82. |
ER-112.4.4 |
Minerva Academy B.Ed. College, Vill/PO –
Amritakunda, City – Berhampur,
District – West Bengal – 742 136 (Private)
(B.Ed) (Kalyani University)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
83. |
ER-112.4.5 |
M. P. College of Education, Vill- Chandni
Chowk, Po- Godhela, Dist.- Madhepura, Bihar-
852113 (Private) (B.Ed) (B N Mandal
University)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
84. |
ER-112.4.6 |
Birampur Anadi Charan Memorial Teacher
Training (D.Ed.) College, Birampur, West
Bengal (Private) (D.El.Ed)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
85. |
ER-112.4.7 |
Nutanhat Teachers Training Institute, Vill/
Town – Nutanhat, PO – Nutanhat, P.S. –
Mongalkote, Dist – Burdwan – 713 147, West
Bengal (Private) (B.Ed) (university of
Burdwan)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
86. |
ER-112.4.8 |
Cambridge Institute of Teachers Education,
Vill- Baheya, Po- Angara, Tehsil- Namkum,
City- Ranchi, Dist- Ranchi, Jharkhand –
835103 (Private) (B.Ed)( Ranchi University)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
87. |
ER-112.4.9 |
BBM B.Ed. College, Sardaha, Vill- Sardaha,
Po-ardaha, Taluka- Chas, City- Bokaro, Dist-
Bokaro, Jharkhand – 827013 (Private) (B.Ed)
(Vinoba Bhave University) |
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
88. |
ER-112.4.10 |
Dinesh College of Education, Vill- Farathiya,
Po- Hoor, Taluka- Garhwa, City- Garhwa,
Dist- Garhwa, Jharkhand – 822114 (Private) (B.Ed)
(Nilamber Pitamber University) |
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
89. |
ER-112.4.11 |
Kingway Technical Institute, Vill- Kulharia,
Po- Kamanasha, Dist- Kaimur, Bihar- 821105
(Private Aided) (B.Ed). (V.K.S University)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
90. |
ER-112.4.12 |
A.R.S. B.Ed. College, Vill- Lakrakhanda, Po-
Bokaro, Dist- Bokaro, Jharkhand – 827010
(Private) (B.Ed) (V.B. University)
|
Noted that the Appellate Authority had
confirmed the decision of ERC. |
|
91. |
ER-112.4.13 |
Steel City College of Education, Vill – City
Centre, P.H – II, PO – Durgapur, Dist –
Bardhaman, West Bengal – 713 208. (B.Ed.)
(Private) (The University of Burdwan)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
As per the appeal order the reply of the
institution submitted on 19.04.2010 and the
application submitted by the institution is
examined and observed that the institution
is still deficient with the following
documents as per the para 7(1) of the
regulation 2009:
1.
Certified copy of the registered land
documents by the competent authority not
submitted.
2.
Notarized copy of Change of Land Use
Certificate not issued by the competent
authority.
In addition to the above the following
deficiency is observed:
3.
Building completion certificate does
not show the plot no., khata no., total area
& built up area from competent civil
authority
4.
Certificate of Registration of
Society/ trust (or a certificate from the
Registering Authority clearly indicating
provisions of act/ law under which the trust
has been registered) not submitted.
5.
As per the building plan submitted by
the institution the total area is 28338.29
sq.mtr where as in the affidavit the total
area is mentioned as 5600 sq.mtr which do
not tally.
6.
As per the site plan submitted by
the institution at pg.66 the land is handed
over possession to the Durgapur Social &
Education Trust for setting up a Law & F.D.
college the same thing is also mentioned in
the possession certificate submitted by the
institution which is at pg.67
7.
The FDRs of Rs.5.00 lacs and Rs.3.00 lacs
submitted by the institution was returned to
the institution along with the rejection
order. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
all documents submitted by the institution,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Status of the land from the
proposed college as it clear from the maps
having many plots. A certificate to be
obtained from the competent authority of the
area regarding land and other identified
deficiencies to be sought before placing to
ERC.
Hence, Clarification
be issued to the institution before refusing
recognition for B.Ed. course on account of
deficiencies, observations & remarks of ERC office.
The institution is to submit written
representation within 30 days of issue of
the notice.
|
|
92. |
ER-112.4.14 |
College of Teacher
Education, Vill – Durabila, PO – Dhumkuria,
City – Chandrakona Town, Dist – Midnapore,
West Benga l – 721201 (D.Ed.) (Private) (West
Bengal Board of Primary Education) (APP-441)
|
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
No reply received in response to ERC
deficiency letter dtd. 22.12.2009. The same
deficiency exists as per the refusal letter
dtd. 15.05.2010.
1.
The trust of the institution is
already recognized for D.Ed. course for the
institute namely Gopsai Avindanan Sangha
PTTI. Now the institution is again applied
for granted of recognition for D.Ed. course
in the name of College of Teacher Education,
Durabila. However, it is pertinent to
mention here that the address of both the
institution is same but the difference is in
name.
2.
Notarized copy of conversion/change
of Land use certificate from the competent
authority not submitted.
3.
Date of registration is not given in
the affidavit. The institution also not
submitted enclosure as per column 5 of the
affidavit.
4.
Total area not mentioned in the
approved building plan.
5.
Built up area mentioned in the
building plan do not tally with the
affidavit.
6.
Total area and built up area not
mentioned in the building completion
certificate.
7.
Building completion certificate
mentioning the total area, and built up area
not from the competent civil authority.
8.
Original FDR of Rs.5.00 lacs and
Rs.3.00 lacs towards endowment fund and
reserve fund as the FDRs were returned to
the institution after refusal of
application. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
all documents submitted by the institution,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Clarification to
be sought from
the institution within 30 days on the
deficiencies pointed out before reversal.
|
|
93. |
ER-112.4.15 |
Abul Kalam Minority Teachers Training
College, Vill- Katahari, Po- Sathi, Tehsil-
Shikarpur, Dist.- Katahari, Bihar- 845449
(B.Ed) (Privatre) (B.R. Ambedkar Bihar
University ) (Code No. ERCAPP310) |
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
1.
The Appellate authority vide order
dated 15th Sept 10 had stated
that the land documents are in the name of
of Abul Kalam Minority Teacher Training
College B.Ed, Kathari West, Distt
Champaran, Bihar through Secretary Mr. Md.
Hafizur Rahman, whereas as per the certified
copy of land documents available in file (Pg
59), the land documents are in the name of
Abul Kalam Minority Teacher Training College
B.Ed, Kathari West, Distt Champaran, Bihar
Secretary Hafizur Rahman. As per the
decision of Appellate Authority in various
orders and the precedence being followed by
ERC, these type of land documents are
considered in the name of individual. One
such order No. F.No. 89-705/2010-Appeal
dated 15th Sept 2010 is placed in
the file for perusal of ERC. Moreover, from
the legal opinion given by Sh. Anwar Alam,
Advocate submitted by the institution (Pg
49), the Advocate had also clearly stated
that Sh. Hafizur Rahman is the actual owner
of the landed property.
2.
Further, the Non-Encumbrance
certificate is also issued in the name of
Individual.
3.
The Appellate Authority itself in its
order (para 3) had stated that the
construction of ground floor was completed
on 25.10.09. Moreover, as per the
application form (Pg 74), Building
completion Certificate (Pg 45), the building
was complete as on 25th October
2009, whereas the land documents registered
on 27th Oct 09 has no mention of
the constructed building, not even the
ground floor, as has been observed by the
Appellate Authority.
4.
The Appellate Authority in its order
dated 15th Sept 2010 had observed
that the institution had got the building
plan approved by the competent authority
after the completion of building. The
Building plan for the proposed college
submitted by the institution has been
approved on 9th Feb 2010 ie.
after the date of submission of application,
which is not acceptable as per NCTE
Regulations 2009. Moreover, the Appellate
Authority also in various orders had
reiterated the same. One such order No.
F.No. 89-620/2010-Appeal dated 15th
Sept 2010 is placed in the file for perusal
of ERC.
5.
The institution had not submitted the
Change of Land Use issued by the competent
authority. In support of the same, the
institution had submitted a certificate
issued by the Junior Engineer, Gramin Vikas
Vibhag issued on 13th Feb 2010
and notarized on 18th Feb 2010
(Pg 91). The same is not acceptable as per
NCTE Regulations 2009 as the same has been
issued and notarized after date of
application. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
all documents submitted by the institution,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Giving all deficiencies and issues raised in
reversal order with regard to land and
building be clarified by the institution
within 30 days.
|
|
94. |
ER-112.4.16 |
Radha Govind College of Physical Education,
Vill- Gandke, Po- Ramgarh, City- Ramgarh,
Dist.- Hazaribagh, Jharkhand- 829122 (B.
P.Ed) (Private) (Vinoba Bhave University)
Code No. ERCAPP166 |
|
|
Observation of the ERC Office |
Decision of the ERC |
|
|
The institution still deficient for the
following points:
1.
Certified copy of registered land
documents not submitted. Even in the
photocopy of land documents submitted, the
photocopy of back portion of the land
documents with the seal and stamp of
registering / revenue authorities not
submitted.
2.
Notarised CLU not submitted. In lieu
of Change of Land Use, the institution had
submitted a certificate dated 6th
Oct 2009 issued by the Circle Officer
stating that the building constructed is
being used for educational purposes, which
is not notarized (Pg 159/c).
3.
The Building plan has been approved
by Junior Engineer (Civil), B.C.D. Ramgarh
Block, Jharkhand. (Pg 18). The Committee
may please see.
4.
Non-encumbrance certificate has been
issued on 16.06.2010 i.e. after the date of
submission of application.
5.
Further, in response to the reference
sent to the Commissioner cum Secretary,
Primary, Secondary and Higher Education,
Govt of Jharkhand, the Director, Primary
Education vide its letter dated 29th
July 2010 received in this office on 21st
Sept 10 had asked NCTE that the proposal for
B.P.Ed course is not being dealt by their
department. In view of the above, the
matter is submitted for further directions /
guidance in the matter by ERC. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
all documents submitted by the institution,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Deficiency letter to be issued to the
institution taking as a separate case to
submit the reply
within 30 days of issue
of the notice.
|
|
|
ER- ER-112.9: Miscellaneous Item |
|
95. |
ER-112.9.1 |
Dr. B.R. Ambedkar College, Vill & P.O.
Malighati, P.S. Debra, Dist-Paschim
Medinupur, West Bengal – 721211 (B.Ed.
Course) (Vidyasagar University)
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Clarification
be sought from the institution
regarding the Status of Principal duly
countersigned by the competent authority of
the affiliating body. The institution is to
submit written representation within 30 days
of issue of the letter. |
|
96. |
ER-112.9.2 |
Jalangi B.Ed. College, Vill. –
Narasinghapur, Po. – Sagarpara, Ps. –
Jalangi, Dist. – Murshidabad, West Bengal –
742306, Code No.APE00670 |
|
|
Observations of the ERC Office |
Decision of the Committee |
|
|
The institution still deficient the
following documents:
(i)
Affidavit on Rs. 100/- for the change of new
premises not submitted.
(ii)
Building plan not approved by competent
civil authority.
(iii)
Building completion certificate not approved
by competent civil authority.
(iv)
Covered area less than the required.
(v)
As per land document Kh. No. Rs. 1382 but as
per Building plan and building completion
certificate Kh. NO. 1456.
(vi)
Land document also be verified by Committee
for authenticity of the document. |
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Show Cause Notice u/s 14(3)(b) of NCTE Act
be issued to the institution before refusing
recognition for shifting of premises for
B.Ed course on account of deficiencies,
observations & remarks of ERC office. The
institution is to submit written
representation within 30 days of issue of
the notice.
|
|
|
ER-112.9.3 |
Complaint Cases |
|
|
Name of the Institution |
Decision of the ERC |
|
97. |
Hari Narain Singh Institute of Teachers
Education, Sasaram, Bihar |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that the
matter is sub-judice.
|
|
98. |
Mahabodhi Mahavidyalaya, Bihar Sharif,
Nalanda, Bihar |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that the
matter is sub-judice.
|
|
99. |
Millat Shikshak Prashikshan Mahavidyalaya,
Madhubani, Bihar |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that the
matter is sub-judice.
|
|
100.
|
Complaint received against 14 teacher
training institutions under the SCERT |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that the
State Govt of Orissa had given an assurance
and hence, no action needed on the
complaint.
|
|
101.
|
Dr. B. R. Amebdkar College of Education,
Bodhgaya, Bihar |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that the
matter is sub-judice.
|
|
102.
|
Magadh B.Ed College, Aurangabad, Bihar &
Mahila B.Ed College, Amba |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that the
matter is sub-judice.
|
|
103.
|
Gyan Prakash College of Education, Bihar |
On careful perusal, observation and
consideration of the complaint received
along with the original file, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that it
is a new case and hence decided that no
action needed on the said complaint.
|
|
104.
|
ER-112.9.4 |
Regional Institute of Education, Bhubaneswar,
Orissa |
On careful perusal, observation and
consideration of the request of the
institution along with the original file,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided as
follows :-
Enhance of seats approved from the academic
session 2010-2011 as under subject to the
following conditions :-
1.
The admission of students shall be
made only after affiliation by the examining
body before the commencement of the academic
session and the admission of students shall
be completed well before the cut off date
prescribed by the examining body for the
academic session 2010-2011 failing which the
recognition will be effective from the
academic session 2011-2012 only.
2.
Formal orders for permission will
operate for 2010-2011 only if the
requirement of 200 teaching days the session
is fulfilled as per the calendar of the
University/ Affiliating Body.
|
Course |
Existing Intake |
New Intake |
|
M.Ed |
32 |
49 |
|
B.Ed – 2 years |
100 |
154 |
|
B.Sc B.Ed 4 year |
100 |
154 |
Upgradation of infrastructure and details of
expansion of faculty etc shall be verified
by the expert teams.
1.
|
|
105.
|
ER-112.9.5 |
Reference received from Sh. Ghaneshyam,
Former MLA & Minister, Govt of Bihar |
On careful perusal, observation and
consideration of the request of the
institution along with the original file,
reference received from former MLA, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
all the cases be examined by office and the
detailed report be submitted in the next
meeting of ERC.
|
|
106.
|
ER-112.9.6 |
References received
from L. N. Mithila University
CR-1185/10 dated 21st
July 2010
CR-1184/10 dated 20th
July 2010 |
On careful perusal, observation and
consideration of the request of the
institution along with the original file,
reference received from former MLA, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC decided that
the Registrar of the University be informed
that the matter is sub-judice.
|
|
TABLE AGENDA
|
|
107.
|
ER-112.9 |
Swami Sahajananda
Saraswati Sewa Samaj, Bokaro Steel City, Po-
Sector-9, City- B.S. City, Dist.- Bokaro,
Jharkhand- 827009
|
|
|
Observations of the ERC Office
|
Decision of the Committee |
|
|
The institution was issued Refusal Order by
ERC office vide letter No. ERC/7-111.4.4/2010/5090
dated 24th September 2010 as per
the decision of ERC in 111th
meeting held on 16th-17th
September 2010 on the following grounds :-
1.
The institution had stated that at
the time of inspection only outside plaster
of two rooms was incomplete due to excessive
heat outside which after rainfall now stands
completed, however, no documentary proof has
been submitted to this effect. As per NCTE
Regulations, the building has to be complete
in the form of permanent structure at the
time of inspection, whereas the institution
itself has agreed that the building was
under construction at the time of
inspection.
2.
The institution had stated that it
had added more apparatus, instruments,
equipments in the Science, Psychology and ET
Lab,
3.
The institution has stated that they
are having 3750 books in the library,
whereas as per the VT Report, the VT Members
have stated that the institution is having
1504 books.
4.
In reply to deficiency at Sr. No. vi,
the institution had stated that the size of
multipurpose hall has been extended to 2040
sq.ft, but no certificate / documentary
proof has been submitted to the said effect.
5.
With regard to approval of the
building construction for B.Ed college in
the leased building, the institution had
submitted a certificate from AGM (L&E),
SAIL, Bokaro stating that the request of the
institution to start job oriented courses in
addition to the school level course has been
examined and it can be acceded to.
6.
The building plan submitted by the
institution was approved for the purpose of
school. The institution had submitted a
different building plan alongwith the reply
dated 5th Aug 2010, which is not
approved by the competent authority.
7.
As per the land documents submitted
by the institution, the land is allotted on
lease basis by the Steel Authority of India
Ltd for running a High School. As per the
requirement of the Regulations 2007, the
land must be in the name of the institution
/ society.
8.
As per the Appeal order, the
institution must obtain NOC from SAIL,
Bokaro (However, NOC is not sufficient as
per Regulations, rather the land must be in
the name of the institution)
9.
The institution has submitted a
letter from SAIL, Bokaro which cannot be
treated as NOC and it does not fulfill the
requirement as directed by the Appellate
Authority.
10.
The institution has not submitted CLU
from the competent authority.
11.
Further, on perusal of file, it is
seen that the FDRs towards EF & RF were
returned to the institution, which has not
since been submitted by the institution.
12.
Hence, the Committee decided that the facts
of the case was deeply observed in respect
of lease land, the comments of Director of
Education, Government of Jharkhand which are
negative and other deficiencies with
regard to infrastructural and instructional
facilities, the Refusal order u/s 14 (3) (b)
may be issued on the institution for B.Ed
course.
The institution vide letter dated 24th
Sept 2010 received in this office on 28th
Sept 2010 i.e. after the issue of Refusal
Order had submitted a representation and
requested for grant of recognition of B.Ed
course. The institution had submitted the
following documents :-
1.
Letter from SAIL, Bokaro
2.
Photographs of the building
3.
Certificate from chartered engineer
4.
Copy of accession register
5.
List of instructional facilities in the
laboratory
6.
FDRs towards Endowment and Reserve Fund
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
all documents submitted by the institution,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that
the ERC in its 111th meeting
decided to issue orders of Refusal and
subsequently a letter was sent on 24th
Sept 10 u/s 14 (3) (b). The reply is still
awaited, the matter be placed in the next
meeting on having careful examination for
review.
|
|
108.
|
Bridge Course for PTTI trainees in West
Bengal – ERC/06-2/WB-2010) |
On careful perusal, observation and
consideration of the proposal of the
Government along with the original file,
office observation & remarks, related
clarifications/ guidelines received from the
NCTE Hqrs., the NCTE Act., Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the ERC noted that
in the letter No. F.ERC/06-2/WB/2010/3878
dated 08th May 2010 of the ERC on
page 2, para (a) may be read as :-
“The Bridge Course is restricted to the PTTI
trainees who have already completed one year
PTTI course and possess 10+2 with a minimum
of 50% marks”.
|
|
109.
|
General Decision of the
Committee
References received
from NCTE-HQrs
Letter No. 49-6/2010/NCTE(N&S)/
A24458 dated 15th September 2010
received from NCTE-HQrs.
The NCTE Hqrs. vide letter No. 49-6/ 2010/
NCTE(N&S)/ A24458 dated 15th
September 2010 had forwarded the report of
the Review Committee of the Ministry on the
working of NRC (report not received along
with the letter at ERC) and directed
Regional Directors to take necessary
measures to improve the functioning of the
Regional Committees in the light of the
following:
i.
The Regional Director should verify the
correctness of the facts before signing any
note and letter particularly the letter of
deficiency issued to the applicant
institutions.
ii.
The Regional Directors have to ensure that
no step in the recognition process is
overlooked or dealt with unsatisfactorily.
iii.
Necessary action should be taken to ensure
proper numbering of files and note sheets
and to maintain up-to-date and complete
record of all applications and other
documents in the Regional Office
systematically.
iv.
As per the Regulations, the Visiting Team
Report should be placed on the website of
the Regional Committee after its
consideration by the Regional Committee.
v.
The deficiency letter should clearly specify
the exact nature of the deficiency.
vi.
The refusal/ withdrawal order should
indicate in very specific terms the
deficiencies that have resulted in refusal/
withdrawal of recognition.
vii.
In all those cases where application has to
be refused by the Regional Committees,
before passing any order of Refusal of
application, the Regional Committee will
essentially issue a Show Cause Notice to the
institution and giving it an opportunity to
explain its position.
The NCTE Hqrs. had also directed that the
compliance report in respect of the above
points be sent to NCTE Hqrs.
|
On careful perusal, observation and
consideration of the proposal of the
institution along with the original file,
all documents submitted by the institution,
related clarifications / guidelines received
from the NCTE Hqrs., the NCTE Act, Rules,
Regulations 2009 stipulated by the NCTE,
norms and standards, the Committee decided
the following :-
General decision
The ERC while considering the cases of
different institutions for the process of
recognition / refusal it was observed.
i)
There are institutions which made efforts to
fulfill the required norms of land and other
infrastructure but having a marginal short
in the size of M.P. Hall less than 2000
sq.ft. even if the built up area is more
than the required size i.e. 1500 sq mtrs.
ii)
The ERC also observed that the DIETs and
Govt. institutions supported under centrally
sponsored scheme of Teacher Education though
the institutions are very old with having
adequate land much more than the required
norms having a shortage of built-up area
without the provision of Multi Purpose Hall
in the existing infrastructure. The
Committee is of the view that such
Govt.-Institutions where sufficient scope
for such expansion feasible be given
relaxation and this should also be approved
to N.E.R institutions where natural
calamities and earthquakes are the casual
phenomena.
iii)
The ERC while considering few a Govt.
institutions where process of filling up the
vacant posts of teachers are going on, be
given opportunity for early compliance
instead of inspection u/s 17.
The ERC recommends relaxation by the
Chairperson NCTE (I) and (II) above under
the clause 12 of the Regulation 2009 and
directions on (iii) if any.
Decision on para (1)
i)
The Regional Director, ERC, please ensure
efforts for the availability of the Report
of the Review Committee of NRC to all
members.
ii)
Regional Director can not see the
correctness of ERC decision. Above direction
are not within the provisions of the
regulation 1996.
iii)
No comment on Para(II).
iv)
No comment on the direction to R.D. on
Para(iii) but to ensure the availability of
all applications received, accepted,
rejected to the Members for 2011-12 and
strictly adhere to the rules and in case of
confusion, clarification be sought from the
NCTE, HQ
v)
The compliance of ERC decision to be ensured
and if any contravention is noticed to be
placed before the ERC in next meeting.
vi)
Decision on Refusal / Recognition to be
issued in the right spirit in speaking order
form.
vii)
The NCTE HQ. may look to the above and issue
directions for follow up action with regard
to the submission of application for
2011-12, keeping 7(1A) Clause in mind.
viii)
The R.D. is also advised to ensure the
directions given and strictly adhere to the
rules for 2011-12 and incase of any
confusion, clear directions from the HQ be
sought. |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The next date of meeting may be
decided by the Regional Director in consultation
with the Chairperson-ERC.
The Meeting ended with vote of thanks
to the Chair.
Dr. H.S. Tripathi
Prof. J.C. Soni
Regional Director, ERC
Chairperson, ERC
|